Design And Construction Of A High And Low Voltage Cut-Off With Time Delay And Alarm

ABSTRACT

The power line fluctuations and cut-offs causes damages to electrical appliances connected to the line. It is more serious in the case of domestic appliances like fridge and air conditioners. If a fridge is operated on low voltage, excessive current flows through the motor, which heats up, and get damaged.
High and low voltage cut off is a device designed to protect electrical appliances from over voltage as well as under voltage. The under/over voltage protection circuit with time delay presented in this work is a low cost and reliable circuit for protecting such equipments from damages. Whenever the power line is switched on it gets connected to the appliance only after a delay of a fixed time. If there is hi/low fluctuations beyond sets limits the appliance get disconnected. The system tries to connect the power back after the specific time delay, the delay being counted from the time of disconnection. If the power down time (time for which the voltage is beyond limits) is less than the delay time, the power resumes after the delay: If it is equal or more, then the power resumes directly.

This circuit has been designed, built and evaluated by me to use as a protector for my home refrigerator. This is designed around readily available semi-conductor devices such as standard bipolar medium power NPN transistor .

The complete circuit is consisting of various stages. They are: – Dual rail power supply, Reference voltage source, Voltage comparators for hi/low cut offs, Time delay stage and Relay driver stage.

TABLE OF CONTENT

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENT

CHAPTER ONE

1.0      INTRODUCTION

1.1      PROBLEM STATEMENT

1.2      OBJECTIVE OF THE PROJECT

1.2      SIGNIFICANCE OF THE PROJECT

1.3      APPLICATIONS OF THE PROJECT

1.4      ADVANTAGES OF THE PROJECT

1.5      SCOPE OF THE PROJECT

1.6      PROJECT ORGANISATION

CHAPTER TWO

2.0      LITERATURE REVIEW

2.1      REVIEW OF VOLTAGE REGULATION

2.2      OVERVOLTAGE TO HOMES APPLIANCES

CHAPTER THREE

3.0     CONSTRUCTION/ METHODOLOGY

3.2     BLOCK DIAGRAM OF THE PROJECT

3.3     CIRCUIT DIAGRAM OF THE PROJECT

3.4     SYSTEM OPERATION

3.5     CIRCUIT DESCRIPTION

3.6     DESCRIPTION OF MAJOR COMPONENTS USED

CHAPTER FOUR

4.0      RESULT ANALYSIS

4.1      INSTALLATION OF THE COMPLETE DESIGN

4.2      CONSTRUCTION PROCEDURE AND TESTING

4.3      CASING AND PACKAGING

4.4      ASSEMBLING OF SECTION

4.5      TESTING OF SYSTEM OPERATION

4.6      PROBLEMS ENCOUNTERED

4.7      COST ANALYSIS

CHAPTER FIVE

5.1      CONCLUSION

5.2      RECOMMENDATION

5.3      BIBLIOGRAPHY

CHAPTER ONE

1.1                                          INTRODUCTION

High and low voltage cut off is a device designed to protect electrical appliances from over voltage as well as under voltage. The under/over voltage protection circuit with time delay presented in this work is a low cost and reliable circuit for protecting such equipments from damages. Whenever the power line is switched on it gets connected to the appliance only after a delay of a fixed time. If there is hi/low fluctuations beyond sets limits the appliance get disconnected. The system tries to connect the power back after the specific time delay, the delay being counted from the time of disconnection. If the power down time (time for which the voltage is beyond limits) is less than the delay time, the power resumes after the delay: If it is equal or more, then the power resumes directly.

This work provides few circuit ideas that can provide low voltage and over voltage protection to connected electrical assets. Though these circuits won’t be able to stabilize the input voltage, even so may prove very effective in providing total safety to your precious electrical home appliances against dangerous input voltages.

The first design of a low voltage indicator circuit may be used to indicate the presence of dangerous low voltage conditions.

A low voltage may appear to be something that is lower in magnitude and power, but that is what makes it more lethal. For example a refrigerator working at 230 volts AC mains will never “like” voltages below 190, since in such cases its compressor due to the lack of sufficient voltage, will try to compensate by drawing heavy currents and may get damaged if the situation persists. The same is true for other types of AC operated motors.

Also in vehicles, for example a car, if the battery voltage falls below 9 volts, it may be quite harmful for the life of the battery itself and moreover the vehicle will just not start at that voltage.

1.2                                                  PROBLEM STATEMENT

In the era of development, advancement and pace we attained efficiency, mobility, flexibility and comfort but we need safe guard as well as. We, as students of electrical side has thus got motivation to design such a system that ensures protection of different electrical junctions and aware us even if we are distant from devices in uncustomary fashion.

The gradual developing rate of accidents because of electrical overflow is alarming for Nigerian. This project physically gives us little hope to advance a bit for protection of devices and electrical systems.

1.3                                          OBJECTIVE OF THE PROJECT

The objective of this work is:

  • Provide a solution to under voltage and over situation faced by residents of high density areas of Nigeria by designing and constructing an effective and comparatively cheaper voltage stabilizer which will have a cost price of less than total cost obtained which could be afforded by most low income earners.
  • To regulate the voltage of there is any over voltage or under voltage an regulate the voltage that will suit the purpose the analysis design, construction and cost comparison have been done and necessary tests have been satisfactory out.

1.3                                        SIGNIFICANCE OF THE STUDY

As a student of electrical and electronic engineering, working on this project have expose my knowledge to function and working principle of many electrics components such as voltage comparator, transistor, and mainly to auto-transformer.

It has made me to understand the working principle and application of s of over and under voltage cutout if for both in homes and industries.

1.4                                     APPLICATIONS OF THE PROJECT

Over or under voltages in electricity is one of the major problems that affect their production. Due to high demand of electricity to sustain their operations, it results to low or high voltage output which can damage equipments. Therefore, these companies need specialized devices to help them protect their equipments from early wear and tear. High-And-Low Voltage Cut-Out is an electromechanical constituents that control the regular voltage outputs. During peak consumption of electricity, the sudden flow of power can damage electric or electronic machines. On the other hand, if there is low output of voltage, a machine may fail to function. It  provide safe output to guard varieties of equipments including ultra modernized music systems, medical equipments LCD, Home Theater, industrial machines and more. They are designed with special features to protect equipments which include line noise spike protection, primary switching technology, auto reset, and overload cutoff protection. In order to preserve the life of machines, these devices are recommendable in any operation. They assure that machines are working well all the time especially in peak timings.

1.5                                          ADVANTAGES OF THE PROJECT

  1. Cost is less as compared to voltage stabilizers
  2. Consumes less power.
  3. This circuit is used in homes and offices to protect equipments from high voltages and low voltages.

1.6                                                 SCOPE OF THE PROJECT

This straight forward circuit will protect electrical appliances from over voltage as well as under voltage. The circuit also produces an alarm when the power supply comes back. An ideal circuit for home to protect your valuable equipments from voltage fluctuations. The same circuit with some modifications can be used  to make a automatic voltage stabilizer.

The timer NE555 is wired as a monostable multivibrator with a pulse width of 10ms.When the power comes back after a cut off a negative voltage is obtained at the trigger pin which triggers the IC NE555.

1.7                          PROJECT WORK ORGANISATION

The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:

Chapter one of this work is on the introduction to low and high voltage cut out. In this chapter, the background, significance, objective limitation and problem of low and high voltage cut out were discussed.

Chapter two is on literature review of low and high voltage cut out. In this chapter, all the literature pertaining to this work was reviewed.

Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.

Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.

Chapter five is on conclusion, recommendation and references.

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design And Construction Of A High And Low Voltage Cut-Off With Time Delay And Alarm, and acknowledges the contributions of scholars who have previously conducted similar research [REV3985] …

Document Information

  • Format: DOC/PDF
  • Title: Design And Construction Of A High And Low Voltage Cut-Off With Time Delay And Alarm:

YOU MAY LOVE THESE (Recommended)

Posted under:

To start a project on Time Series Analysis On The Treatment Of Some Common Diseases, follow these guidelines: This study out to establish the current trend of most common ill-health among the students of kwara state polytechnic Ilorin as well as the student patronize the medical centre within a define time frame. the least square approach were employed which revealed the present of trend and season effec…

36 Pages 1 - 5 Chapters 4,066 Words DOC/PDF Format Instant Download UPN24704

To develop a project on Self Organization And Time Management Skills Needed By Modern Secretaries For Successful Job Performance In The Banking Industry, follow these approaches: This study centered on self organization and time Management skills on the job perforance of secretaries. Population under study was secretaries. Population under study was secretaries of New Nigeria Bank Plc, Lagos. The purpose of the study was to find out how secretaries can enhance their job p…

49 Pages 1 - 5 Chapters 5,961 Words DOC/PDF Format Instant Download UPN2432

Discover how to write the “Real Time School Bus Tracking System Using (RFID)” Project

Posted under:

To undertake a project on Real Time School Bus Tracking System Using (RFID), follow these effective ways: In present time due to increase in number of kidnapping and road accident cases, parent always worry about their children. This paper proposes a SMS based solution to aid parent to track their children location in real time. The proposed system takes the advantage of the location services provide…

35 Pages 1 - 5 Chapters 4,739 Words DOC/PDF Format Instant Download UPN2402

How to structure the “Project Time Control In Building Construction” Project

Posted under:

To write a project on Project Time Control In Building Construction, follow these structure: Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitation…

68 Pages 1 - 5 Chapters 15,719 Words DOC/PDF Format Instant Download UPN2463

Posted under:

To carry out a project on Mathematical Model On Human Population Dynamics Using Delay Differential Equation, follow these effective methods: Simple population growth models involving birth rate, death rate, migration, and carrying capacity of the environment were considered. Furthermore, the particular case where there is discrete delay according to the sex involved in the population growth were treated. The equilibrium and stability …

42 Pages 1 - 5 Chapters 8,681 Words DOC/PDF Format Instant Download UPN24614

Posted under:

To start a project on Knowledge And Acceptability Of Cervical Cancer Screening Among Female Part-Time Students, follow these guidelines: Cancer  of  the  cervix  remains  the  most  common  malignant  neoplasm  of  the  female  genitalia  and  the  second  most  common  cancer  in  female  students.  Cervical  Cancers  screening  serves  to  detect  the  possibility  that  a  cancer  is  present.  The  main  objective  of  the  st…

88 Pages 1 - 5 Chapters 11,904 Words DOC/PDF Format Instant Download UPN13417

To develop a project on Implementation Of Unified Power Flow Controller (UPFC) For Improvement Of Voltage Stability In A Congested Electric Network, follow these approaches: This seminar focuses on the implementation of various microcontrollers such as AT89C51 microcontroller using pulse width modulation (PWM), AT89C51 microcontroller for D.C motors and fuzzy logic controller for induction motor speed control. In pulse width modulated wave which modulation (PWM) cont…

70 Pages 1 - 5 Chapters 7,914 Words DOC/PDF Format Instant Download UPN22990

To undertake a project on Impact Of Social Media Use And Time Management On Secondary School Student’s Academic Performance, follow these effective ways: This study was carried out to examine the impact of social media use and time management on secondary school student’s academic performance using some selected secondary schools in Owerri Municipal Local Government Area, Imo State as a case study. The study was specifically set to ascertain the e…

67 Pages 1 - 5 Chapters 16,359 Words DOC/PDF Format Instant Download UPN17354

Posted under:

To write a project on Effect Of Time Management As A Tool For Organizational Survival, follow these structure: In an organization there are a number of resources which have to be used such as money, people and materials. But there is one resource everybody has in common and that is time. The problem being scrutinized in this study was how to manage time in order to improve performance. The study assessed …

40 Pages 1 - 5 Chapters 9,040 Words DOC/PDF Format Instant Download UPN4782

To carry out a project on Effect Of Storage Time On The Functional Properties Of Wheat Bambka Groundnut Blend, follow these effective methods: Study of effect of storage time on the functional properties of wheat (Triticum Aestivum) and Bambrara Groundnut (Voandzeia Subteranea) Flour Blends. The flour blends comprised of wheat (WT) 1005, Banbaranut (BG) 100%, WBZO 70% wheat and 30% Bambaradnut, WB20 80% wheat and 20% Bambara and WBSO, 5…

70 Pages 1 - 5 Chapters 9,971 Words DOC/PDF Format Instant Download UPN2103

Live Chat