Design And Construction Of A Time Relay Based Automatic Power Resumption Alarm

Power restoration is a period of time when the electricity supply to a particular building or area is restored, for example because of replacement or servicing damage to the cables or any other reason. Sometimes when power resumes the occupant of the house may not be aware unless power resumption alarm is used in such home to detect the presence of power supply resumption. Most power-resumption alarm devices produce non-stop alarm when power resumes. To overcome this problem, this automatic circuit that sounds an alarm for few seconds only after power resumes. Whenever power failure occurs this circuit does not sound any alarm.

1.0 INTRODUCTION
Service restoration is one of the most mission-critical processes at a utility. When the lights go out, it’s the utility’s top job to restore service. Many utilities create storm response organizations that are activated when a large-scale outage occurs, and utility personnel immediately jump into their role in that organization.
Without a smart grid, the outage response process relies heavily on partial information and incomplete visibility. Moreover, utilities continue to depend heavily on customer calls to report outages – and they lose valuable restoration time waiting for customers to report outages, especially when outages occur in the middle of the night.

Fortunately, with a smart grid, utilities can take advantage of a variety of specific real-time technologies that help address these limitations. AMI meters play a crucial role in speeding service restoration. They deliver immediate last gasp alarms whenever power is lost and service restoration notifications when service is restored.

In modern society, it is impossible to imagine life without electricity. Modern equipment requires a continuous supply of electricity. Not only industry, but also in the household. Take the case of an ordinary refrigerator. If you experience a power off situation, your food will be spoilt. But much more important, what if the power failure “spoils” your business. For example, uninterrupted power supply is needed for your server, which manages your accounting programme or provides uninterrupted operation of your website.
Of course, in most critical applications, uninterruptible power supplies (UPS) are used, but this is not always the case. Also, these devices cannot provide continuous operation in the event of remote power off. Often you need to take other action according to the situation.
For us to be notified when the power restoration has occurred a power supply signal device is used. This system indicates when there is power failure through alarm indication. As soon as the system experiences power failure you will receive a signal from an alarm.

1.2 AIM AND OBJECTIVES OF THE PROJECT
The main aim of this study is to build a timer relay based automatic power resumption alarm. The objectives of the project are:

  • To design a power supply monitoring device that will trigger a buzzer when the mains supply restoration.
  • To be informed when national grid power is restored
  • To save energy

1.3 SIGNIFICANCE OF THE PROJECT
The power restoration alarm is intended to be installed on a manual transfer panel or generator-ready load center. During a power outage, when the main breaker has been turned off to allow the generator to provide emergency power to the panel, the power outage can be activated and will emit a pulsing 105dB alarm when the power outage ends and utility power is again available.
Power restoration alarm notifies you by alarm when your electrical equipment suffers a power supply. If you have important equipment you want to run and want to know if there has been a power supply so that you power the device, this app can help you by telling you when electric power is supplied.

1.4 LIMITATION OF THE PROJECT
It is true that it is said “everything that has advantages also will have disadvantages,” but for the case of this project, the only limitation is that it causes disturbance. When the alarm blows it causes distraction. Even at the middle of the night when there is power restoration/ power supply, the alarm will distract one’s sleep

1.5 APPLCATION OF POWER RESTORATION ALARM
Typical uses of power restoration alarm includes monitoring:

  •  fridges/freezers;
  • fish tanks/aquariums;
  • sump pumps;
  • computer equipment;
  • heating systems;
  • chemical storage;
  • And many other applications.

1.6 METHODOLOGY
To achieve the aim and objectives of this work, the following are the steps involved:

  • Study of the previous work on the project so as to improve it efficiency.
  • Draw a block diagram.
  • Test for continuity of components and devices,
  • Design of the alarm was carried out.
  • Studying of various component used in circuit.
  • Construct the circuit.
  • Finally, the whole device was cased and final test was carried out.

1.7 PROJECT WORK ORGANISATION
The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:

Chapter one of this work is on the introduction to the power restoration alarm. In this chapter, the background, significance, objective limitation and problem of power restoration alarm were discussed.

Chapter two is on literature review of power restoration alarm. In this chapter, all the literature pertaining to this work was reviewed.

Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.

Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.

Chapter five is on conclusion, recommendation and references.

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design And Construction Of A Time Relay Based Automatic Power Resumption Alarm, and acknowledges the contributions of scholars who have previously conducted similar research [REV4545] …

TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT
TABLE OF CONTENT

CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE PROJECT
1.2 AIM AND OBJECTIVES OF THE PROJECT
1.3 SCOPE OF THE PROJECT
1.4 SIGNIFICANCE OF THE PROJECT
1.5 LIMITATION OF THE PROJECT
1.6 APPLICATION OF THE PROJECT
1.7 METHODOLOGY
1.8 PROJECT ORGANISATION

CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 REVIEW OF ELECTRIC POWER SUPPLY
2.2 HISTORICAL BACKGROUND OF ELECTRIC POWER SUPPLY
2.3 BASICS OF ELECTRIC POWER
2.4 TYPES OF POWER FAILURE
2.5 PROTECTING THE POWER SYSTEM FROM FAILURE
2.6 RESTORING POWER AFTER A WIDE-AREA OUTAGE
2.7 POWER FAILURE INEVITABILITY AND ELECTRIC SUSTAINABILITY
2.8 MITIGATION OF POWER OUTAGE FREQUENCY
2.9 OVERVIEW OF 555 TIMER IC
2.10 HISTORICAL BACKGROUND OF 555 TIMER IC

CHAPTER THREE
3.0 CONSTRUCTION
3.1 BASIC DESIGNS OF THE SYSTEM
3.2 BLOCK DIAGRAM OF THE SYSTEM
3.3 DESCRIPTION OF THE BLOCK UNIT
3.4 SYSTEM CIRCUIT DIAGRAM
3.5 CIRCUIT OPERATION

CHAPTER FOUR
RESULT ANALYSIS
4.0 CONSTRUCTION PROCEDURE AND TESTING
4.1 CASING AND PACKAGING
4.2 ASSEMBLING OF SECTIONS
4.3 TESTING OF SYSTEM OPERATION
4.4 COST ANALYSIS

CHAPTER FIVE
5.1 CONCLUSION
5.2 RECOMMENDATION
5.3 REFERENCES

Document Information

  • Pages: 35 Pages
  • Chapters: 1 – 5 Chapters
  • Words: 4,531 Words
  • Format: DOC/PDF
  • Time: Instant Download
  • Title: Design And Construction Of A Time Relay Based Automatic Power Resumption Alarm:

YOU MAY LOVE THESE (Recommended)

To start a project on Use Of Manpower Audit For Efficient Man Power Planning, follow these guidelines: The purpose of this research is to investigate on the use of manpower audit for efficient manpower planning in Enugu State Broadcasting Service. In carrying out the research, the researcher used such instrument as questionnaires, interviews and published work to obtain all the relevant data requi…

89 Pages 1 - 5 Chapters 10,155 Words DOC/PDF Format Instant Download UPN996

Understand how to write the “Time Series Analysis On The Treatment Of Some Common Diseases” Project

Posted under:

To develop a project on Time Series Analysis On The Treatment Of Some Common Diseases, follow these approaches: This study out to establish the current trend of most common ill-health among the students of kwara state polytechnic Ilorin as well as the student patronize the medical centre within a define time frame. the least square approach were employed which revealed the present of trend and season effec…

36 Pages 1 - 5 Chapters 4,066 Words DOC/PDF Format Instant Download UPN24704

Discover how to write the “Study Of Impact Of Frequency Deviation On Power System” Project

To undertake a project on Study Of Impact Of Frequency Deviation On Power System, follow these effective ways: The operation and the development of power system networks introduce new types of stability problems.  The effect of the power generation and consumption on the frequency of the power system can be described as a demand/generation imbalance resulting from a sudden increase/decrease in the demand …

62 Pages 1 - 5 Chapters 11,700 Words DOC/PDF Format Instant Download UPN3288

To write a project on Self Organization And Time Management Skills Needed By Modern Secretaries For Successful Job Performance In The Banking Industry, follow these structure: This study centered on self organization and time Management skills on the job perforance of secretaries. Population under study was secretaries. Population under study was secretaries of New Nigeria Bank Plc, Lagos. The purpose of the study was to find out how secretaries can enhance their job p…

49 Pages 1 - 5 Chapters 5,961 Words DOC/PDF Format Instant Download UPN2432

Posted under:
Marketing (1423)

To carry out a project on Role Of Marketing Research In Enhancing Customer Service Level In The Power Industry, follow these effective methods: Marketing research in now giving position in the solving or organisation problems, both private and public owned organisations. The importance of marketing reach to organisation cannot be over emphasised. Organisation as an open system cannot operate in isolation, they must react to environment (…

42 Pages 1 - 5 Chapters 4,755 Words DOC/PDF Format Instant Download UPN2448

Posted under:

To start a project on Real Time School Bus Tracking System Using (RFID), follow these guidelines: In present time due to increase in number of kidnapping and road accident cases, parent always worry about their children. This paper proposes a SMS based solution to aid parent to track their children location in real time. The proposed system takes the advantage of the location services provide…

35 Pages 1 - 5 Chapters 4,739 Words DOC/PDF Format Instant Download UPN2402

Understand how to write the “Project Time Control In Building Construction” Project

Posted under:

To develop a project on Project Time Control In Building Construction, follow these approaches: Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitation…

68 Pages 1 - 5 Chapters 15,719 Words DOC/PDF Format Instant Download UPN2463

Discover how to write the “Problems Of Manpower Development In Government Parastatals” Project

Posted under:

To undertake a project on Problems Of Manpower Development In Government Parastatals, follow these effective ways: The focus of this research work is on the problem of manpower development in government parastatals with special reference to Enugu State Marketing Company which is the case study. The researchers presents the introductory part of the write-up which dealt with the historical background of Enugu S…

76 Pages 1 - 5 Chapters 9,260 Words DOC/PDF Format Instant Download UPN493

Posted under:

To write a project on Power Supply And The Performance Of Small And Medium Scale Industries, follow these structure: This research work centers on the power supply and the performance of small and medium scale industries in Nigeria from 1986 – 2010. carrying out this study, secondary data were collected and empirical analysis was made to achieve these objectives, multiple regression were used in anglicizing the…

66 Pages 1 - 5 Chapters 6,988 Words DOC/PDF Format Instant Download UPN2053

Learn the structure to write the “Power Amplifier” Project

INTRODUCTION Power amplifier is an electronic device, which is used to increase sound energy. In other words, the final stage which must driven a given load e.g mechanical indicator, a loudspeaker cathode roy tade, magnetic deflection coil, a transmitting accrual of a communication network. Power amplifier is also used in regulation power supplies, chopper amplifier, motor controller etc. In general the load will by its nature, demand […]

38 Pages 1 - 5 Chapters 3,996 Words DOC/PDF Format Instant Download UPN2170

Live Chat