Effects Of Delays And Disruption On The Cost Of Building Construction Projects

A Case Study Of Enugu State In Nigeria

This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects.

This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria. According to this study, inadequate planning, incompetent project manager, variation in project scope, political factors, price fluctuation etc., contributes to the delays and disruption of building construction project and thereby affecting their cost also. Most of the proper majors are recommended for the elimination of delays and disruptions on construction project i.e Adequate pre-contract study, engaging competent construction professionals etc.

Introduction

1.1 Background of the Study

Most town and cities in Nigeria are dotted with projects that are being delayed, disrupted, and uncompleted. Explanations giving for the stages of each buildings projects is varied and sometimes attributed to lack of financial, human and material resources with which to execute the projects. It is common in Nigeria especially now that the country is suffering from depression in the economy. It is often bad to see huge capital investments being disrupted and abandoned.

Any attempt to delay and disrupt a construction project, will have terrible consequences on every aspect of the nation’s activities which will be severe and unwelcome.

Delays and disruptive in construction has some effects on its cost and very retrogressive in a developing economy like Nigeria and needs to be properly addressed and tackled with all the courage and effort that we can muster.

1.2 Statement of Problem

One of the biggest problems associated with most of the construction projects in Nigeria today is problem of delays and disruptions at both the pre-contract and post-contract stages of construction in building and civil engineering works.

The cost of building increases at the cause of delays and disruption in construction because of variation. many construction project in Enugu needed huge capital outlay and time to execute them and any attempt to delaying and disrupting the construction proper will result to terrible consequences that will affect the economical control and building cost.

1.3 Purpose of the Study

The purpose of this study is as follows –

  1. To investigate into most delayed and disrupted construction projects
  2. To ascertain the effects of delays and disruptions on cost of building construction.
  3. To examine the effect of fluctuation in prices on construction projects costs.
  4. To examine the costs of delayed and disrupted construction project to clients, contractors, the professionals that are engaged and the nation, in particular Enugu state.
  5. To examine the effects of variation in design on construction project costs.

1.4 Research Question

  1. What are the causes of delays and disruptions in construction projects?
  2. What are the effects of delays and disruptions on building construction project cost?
  3. Do fluctuations in prices bring about changes in construction project cost?
  4. What the costs are of delayed and disrupted construction projects to the clients, contractors, the professionals that are engaged in the field?
  5. In what ways can variations in design affect construction cost?

1.5 The Significance of the Study

This study will be beneficial to the most construction industry in Nigeria because once a project is initiated and manage properly it will eliminate high cost of procurement and a lot profit are involved.

Also this will help in planning and execution of future construction project executions, especially the quantity surveyor in the feasibility and planning stages of a proposed scheme and preparation of work method and schedules by the building manager.

The study also intend to bring together, the causes of construction delays and disruptions and also tries to ascertain the costs, which will help the construction firms, Engineers, Surveyors and construction managers to initialize and control their project without lost or poor management.

1.7 Definition of Terms

From the Oxford advanced learner’s English dictionary, delay implies the process or action of being slow being late or linger and also explain disruption as the action of making it difficult for something to proceed.

Delay

Delay in construction can be defined as an act whereby projects execution is slow or interrupted one time or the other, thereby leading to unnecessary extension in the programme of work from what was initially scheduled.

Disruption

Disruption in construction projects can be defined as an act or sites partially or completely deserted at one time or the other for the reasons of certain exigencies which have resulted in prolonged delays which are not in accordance with the programme of work in use extension of time or postponement as initially scheduled.

Cost

The estimated amount of money that will be needed for something or the price that should be charged for something.

Also, it implies the effort, loss or damage that is involved in order to do or achieve something.

Construction

The process or method of building or making something, especially road, building, bridges etc.

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Effects Of Delays And Disruption On The Cost Of Building Construction Projects, and acknowledges the contributions of scholars who have previously conducted similar research [REV26837] …

Title page

Certification page

Dedication

Acknowledgement

Abstract

Table of content

 

Chapter One

Introduction

1.1 Background of study

1.2 Statement of problem

1.3 Purpose of study

1.4 Research Questions

1.5 Significance of study

1.6 Scope of Study

1.7 Definition of Terms

 

Chapter Two

Literature Review

2.1 Delay and Disruption

2.2 Construction Delay and Causes

2.2.1 Why Construction Projects are delayed and Abandoned

2.2.2 Common problems causing delay in construction

2.2.3 Inadequate pre-contract study and Planning

2.2.4 Award of Contract

2.2.5 Variations

2.2.6 Fluctuations

2.2.7 Natural Disaster

2.2.8 Poor Executive Capacity of the Contractor

2.3 Cause of High Costs of Construction

2.4 Time Over-Runs and Cost

2.5 Delay and Disruption in Construction in Summary

 

Chapter Three

Methodology

3.1 Research Design

3.2 Area of Study

3.3 Population of Study

3.4 Sampling Technique

3.5 Instrument for Data Collection

3.6 Validity of an Instrument

3.7 Reliability of Instrument

3.8 Method of Data Collection

3.9 Method of Data Analysis

 

Chapter Four

Presentation and Analysis of Data or Result

4.1 Results

Chapter Five

Discussion and Conclusion of Results

5.1 Discussion of Findings

5.2 Conclusion of the Study

5.3 Recommendation

5.4 Implication of the Findings

5.5 Suggestion for Further Study

5.6 Limitation of Study

References

Appendix

Document Information

  • Format: DOC/PDF
  • Title: Effects Of Delays And Disruption On The Cost Of Building Construction Projects: A Case Study Of Enugu State In Nigeria

YOU MAY LOVE THESE (Recommended)

To start a project on Working Capital Management As A Tool For Cost Minimization And Profit Maximization, follow these guidelines: The objective of this research work contains working capital management as a tool for minimization and profit maximization with particular reference to Anambra motor manufacturing company, Enugu. The research design used was the survey method and the sources of data were both primary and secondar…

66 Pages 1 - 5 Chapters 13,185 Words DOC/PDF Format Instant Download UPN551

Posted under:
INTRODUCTION Before a designer can relate his requirements dearly in a construction industry, a drawing is to be prepared; this is because the drawing serves as a general means of communication. Thus, the drawing is adopted mostly, then other means of communication in engineering sectors. A structured engineer mostly engages himself in designs on construction of structures. Like roads, bridges, railways, dams, buildings and other publi […]

28 Pages 1 - 5 Chapters 3,114 Words DOC/PDF Format Instant Download UPN1272

Understand how to write the “Structural Detailing Of Two Storey Building” Project

Posted under:
INTRODUCTION In other to provide information to contractors in a construction industry for works to be carried out on sites, drawings are produce, which serves as means of communication are used by designers in every engineering specters. For those reason, the works are mostly work of a structural engineer to design a construction of structure for sheltering to be completed, such as road, bridges, railways, dams, buildings and other re […]

26 Pages 1 - 6 Chapters 3,136 Words DOC/PDF Format Instant Download UPN2421

Understand how to write the “Role Of Women Cooperative Society In Community Building” Project

Posted under:
1.0 INTRODUCTION The concept cooperative development is a package of development programs, it is defined as the process of propagating cooperative movement as an organization framework through veritable instruments for the utilization and sensitization of man. This situation optimizes the integrated enterprises approach to the people living in both urban and mainly in rural communities. Severally, attempts to have made to achieve initi […]

55 Pages 1 - 5 Chapters 7,711 Words DOC/PDF Format Instant Download UPN1832

Understand how to write the “Role Of Public Relations In Building Corporate Image” Project

Posted under:

To develop a project on Role Of Public Relations In Building Corporate Image, follow these approaches: This study is aimed, at pointing the role of public relations department and the practitioner in building the corporate image in government Parastatals..

74 Pages 1 - 5 Chapters 9,647 Words DOC/PDF Format Instant Download UPN1659

Posted under:

To undertake a project on Role Of Occupational Safety And Health System In Building Disease Resilience In Work Places, follow these effective ways: In this study, our focus was on the role of occupational safety and health system in building disease resilience in work places, Enugu State as case study. The study is was specifically focused on assessing the role of occupational safety and health system in building disease resilience in work p…

53 Pages 1 - 5 Chapters 8,265 Words DOC/PDF Format Instant Download UPN13275

Posted under:
Accounting (2175)

To write a project on Role Of Management Accountant To Cost Control And Profit Performance In An Organization, follow these structure: Accountants have been bestowed with the role of providing information to the management regarding the affairs of the organization in particular and to the stakeholders in general. Internally, in manufacturing organization, management has always relied on the management accountant for cost evaluat…

64 Pages 1 - 5 Chapters 12,587 Words DOC/PDF Format Instant Download UPN295

Learn the structure to write the “Purchasing As A Cost Saving Function In A Manufacturing Company” Project

Posted under:
0.1 INTRODUCTION This work has introduced purchasing as a cost saving function in a manufacturing company. It has endeavored to provide a breef insight to the readers and managers and students and professional men and woman in purchasing and supply management, what purchasing as a cost saving function should internal relationship that leads to understanding and harmony among the various units of the expected goal of the company. The re […]

63 Pages 1 - 5 Chapters 10,091 Words DOC/PDF Format Instant Download UPN1110

Learn the structure to write the “Project Time Control In Building Construction” Project

Posted under:

To carry out a project on Project Time Control In Building Construction, follow these effective methods: Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitation…

68 Pages 1 - 5 Chapters 15,719 Words DOC/PDF Format Instant Download UPN2463

To start a project on Production Cost Control In Manufacturing Organisation, follow these guidelines: This research work is based on the production cost control in manufacturing organization. The study was motivated on how to control cost in manufacturing industries in order to achieve the purpose of which the industry is establish. To solve the research problem the researchers made use of only s…

36 Pages 1 - 5 Chapters 4,574 Words DOC/PDF Format Instant Download UPN198

Live Chat