Design And Implementation Of A Water Level Indicator In Dams To Prevent Hazard

1.0                                                        INTRODUCTION

1.1                                                Background of the study

Dams are the major sources of water supply to cities; they also play a vital role in flood control and can assist river navigation. Most of the dams are built to serve more than one purpose and their benefits are manifold. It is necessary to implement some sort of communication between the metering systems and computer models to provide support in managing the complex systems. The growing interest in the Internet of Things has become the right choice for the pre-alert system for monitoring the rise in the water level in dams. The risk rate of sudden flood occurrence opened up a way for the way the need for the real-time dam water level monitoring and a prior alerting system that ensures the public safety. The industry has always focused to devise engineering methodologies for establishment and modification of relatively easier controlling and automation methods for any scrupulous process. This paper presents the design and implementation of a control system by means of microcomputers and data transmission networks. To verify the principle operation of the Controlling design to be presented a miniature model is experimentally tested using a GSM. GSMbased water level monitoring system for dam in this paper they have introduced the idea of water level monitoring and management.

1.2                                              Statement of the problem

Water level in a dam needs to be maintained effectively to avoid complications. The quantity of water released is hardly ever correct resulting in wastage of water & it is impossible for a man to precisely control the gates without knowledge of exact water level and water inflow rate. We have designed a system in which real time things are interconnected to web. Water level sensors are placed in dam to serve the same purpose automatically and forward the status to GSM. GSM module checks that input and upload the status of water level on the monitoring unit line. By this project each and every variation of water level is informed to control room through the GSM and nearby people can be informed in time thus saving lots of lives and avoiding the unpleasant scenarios and also this system consists of Dam health monitoring system.

1.3                                         Aim and objectives of the study

This work is aimed at building a water level indicator in dams to prevent hazard.

The objectives of the work are:

  1. To build the system prototype at low cost
  2. To ensures the public safety
  • To provide real-time dam water level monitoring and a prior alerting system

1.4      Significance of the study

This study will bring solution to an overflowing of water from dam thereby preventing flooding. With this study, Dam monitoring personnel can identify or monitor the level of water in the dam without visiting the dam. This study will also serve as a means of enlightening students on how to build simple electronics circuits.

1.5      Scope of the study

The scope of this work covers building a water level indicator used for monitoring the level of water in a dam in a real time. In this study,water level sensors are placed in dam to serve the same purpose automatically and forward the status to GSM. The developed system utilizes GSM and SMS to transmit data from sensors to the respective users through their mobile phone.An Arduino UNOboardhasbeenusedasthecontrollingdevice.Thisboardisalowcostmicrocontroller,needssimpleprogrammingand canbeintegrated with other devicesvia theinput-outputinterfaces.By this project each and every variation of water level is informed to control room through the GSM and nearby people can be informed in time thus saving lots of lives and avoiding the unpleasant scenarios.

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design And Implementation Of A Water Level Indicator In Dams To Prevent Hazard, and acknowledges the contributions of scholars who have previously conducted similar research [REV4633] …

Document Information

  • Format: DOC/PDF
  • Title: Design And Implementation Of A Water Level Indicator In Dams To Prevent Hazard:

YOU MAY LOVE THESE (Recommended)

How to write the “Water Purification Unit” Project

Posted under:

To start a project on Water Purification Unit, follow these guidelines: Water Purification Unit or filtration unit is designed in way that it will give a nice result. Like in our filtration, we have sand and carbon filter that were responded to separate the suspended solid particles, odour and taste of the water, which will give a very nice filtered water at the end …

60 Pages 1 - 5 Chapters 7,351 Words DOC/PDF Format Instant Download UPN1222

Understand how to write the “Water Drainage Problems” Project

Posted under:

33 Pages 1 - 5 Chapters 3,001 Words DOC/PDF Format Instant Download UPN21969

Posted under:

To develop a project on Temperature And Water Requirement For Leaching of Caustic Alkalt From “NGU”, follow these approaches: The production and analysis of “Ngu” extract for temperature and water requirement for leaching of casuistic alkali is the basic objective of this project. The production was carried out by using unit operations and also using the female inflorescence of a palm fruit (Eleasis Guineesis) as raw ma…

47 Pages 1 - 7 Chapters 5,369 Words DOC/PDF Format Instant Download UPN1207

Posted under:

To undertake a project on Prevalence Of Water Borne Diseases And It’s Implications On The Health Status Of Inhabitants, follow these effective ways: This study was carried out to examine the prevalence of water borne diseases and it’s implications on the health status of inhabitants of Adogi Community in Nasarawa State. The study was carried out to determine the prevalence of water borne diseases among inhabitants of Adogi Community, assess t…

64 Pages 1 - 5 Chapters 14,669 Words DOC/PDF Format Instant Download UPN13200

Posted under:

To write a project on Physiochemical And Heavy Metal Assessment Of Water From Boreholes, follow these structure: This study presents the result of quality assessment of water from selected boreholes Kaura Namoda Local Government Area Zamfara State. In this study, three different boreholes were sampled, physically examined and assessed for their physicochemical parameters using standard analytical procedures…

62 Pages 1 - 5 Chapters 7,720 Words DOC/PDF Format Instant Download UPN4765

Posted under:

To carry out a project on Modification Of Surface, Physical And Chemical Properties Of Activated Carbons For Water Purification, follow these effective methods: The purpose of this work was to study the effect of chemical surface properties of activated carbons for their use in water purification. To achieve this objective, activated carbon in both granular and powdered forms namely: as received and devolatilized carbons were prepared. Proximate analysis…

75 Pages 1 - 5 Chapters 1,620 Words DOC/PDF Format Instant Download UPN1154

To start a project on Management And Operational Problems Of Rural Water Supply, follow these guidelines: This research work is aimed at finding the courses of the organization and management problems of rural water supply programme in Nigeria, with a case study of Anambra State Water Corporation Awka. To guide this study thirteen (13) research questions were formulated and tested with percentages. B…

67 Pages 1 - 5 Chapters 8,022 Words DOC/PDF Format Instant Download UPN685

Understand how to write the “Ground Water Development For Portable Water Supply” Project

Posted under:

To develop a project on Ground Water Development For Portable Water Supply, follow these approaches: Groundwater hydrology may be defined as the science of the occurrence distribution, and movement of water below the surface of the earth. Geochydrology has an identical connotation, and hydrogeology differs only by its greater emphasis on geology. Utilization of groundwater dates from ancient tim…

60 Pages 1 - 5 Chapters 9,053 Words DOC/PDF Format Instant Download UPN1255

Discover how to write the “Gis-Based Assessment Of Water Availability And Water Demand” Project

To undertake a project on Gis-Based Assessment Of Water Availability And Water Demand, follow these effective ways: This study arose from the growing water demand within the Asa River Basin due to population upsurge, the absence of existing water demand management strategies, the possibility of scarcity as a result of climate change, and the need for sustainable water resources management. The aim of the study…

63 Pages 1 - 5 Chapters 10,683 Words DOC/PDF Format Instant Download UPN2298

Posted under:

To write a project on Fish Abundance And Distribution Of Three Water Bodies, follow these structure: The concentrations of four heavy metals (cadmium, chromium, nickel and vanadium) in the African river prawn (Macrobrachium vollenhovenii) sampled in three months (April, May and June) at three locations along the Ethiope River bank in Delta State, were investigated by means of an atomic absorptio…

66 Pages 1 - 5 Chapters 11,721 Words DOC/PDF Format Instant Download UPN23218

Live Chat