Natural Flow And Artificial Lift For A Solution Gas Drive Reservoir

Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the subsequent expansion of the solution gas as the reservoir pressure is reduced are inadequate to produce such reservoirs to their full capacities. Ultimate oil recovery from natural flow of a solution – gas drive reservoir makes it one of the least efficient primary recovery mechanisms. This leaves a substantial amount of remaining oil residing in the reservoir which must be produced.

Artificial lift technologies such as continuous gas lift, gas lift with velocity strings and positive displacement pumping is therefore employed at later phases of the reservoir’s life to increase the ultimate recovery which is what this project sort to do. Synthetic data based on material balance for a solution – gas drive reservoir is analyzed to predict its primary oil recovery based on which gas lifting, velocity strings technology and positive displacement pumping are suggested to be employed with respect to time at different stages of reservoir’s life.

1.0 Introduction

1.1 Problem Statement

Solution gas drive also known as Dissolved gas drive or Internal gas drive reservoirs are characterised by a rapid and continuous decline of reservoir pressure. This reservoir pressure behaviour is attributed to the fact that no extraneous fluids or gas caps are available to provide a replacement of the gas and oil withdrawals (Tarek, 2001). This rapid and continuous decline of reservoir pressure causes a direct decline of reservoir performance at early stages of the life of the reservoir.

Moreover, the principal source of energy which is gas liberation from the crude oil and the subsequent expansion of the solution gas as the reservoir pressure is reduced are inadequate to produce such reservoirs to their full capacities (Tarek, 2001). Ultimate oil recovery from natural flow of a solution gas drive reservoir (less than 5% to about 30%) makes it one of the least efficient primary recovery mechanisms (Tarek, 2001). The low recovery from this type of reservoir suggests that large quantities of oil remain in the reservoir and, therefore, solution gas drive reservoirs are considered the best candidates for secondary recovery applications.

Artificial lift technologies such as continuous gas lift, gas lift with velocity strings and positive displacement pumping method is therefore employed at later phases of the reservoir in order to increase the ultimate recovery. The main challenge is to know when to change existing production mechanism to a new one for optimum recovery. A production design has therefore been made in an attempt to solving this problem with respect to constraints such as maximum production rate, maximum drawdown, and available gas lift.

The flowing bottom-hole pressure required to lift the fluids up to the surface may be influenced by size of the tubing string (Lyons, 1996) and for that matter the time when tubing strings should be replaced as a function of cumulative production is necessary.

1.2 Method of Conducting the Project

Designing the natural flow and artificial lift tubing strings for the whole life of a well forms the tasks of this project. This is based on certain constraints such as maximum production rate, maximum drawdown, and available gas lift and horsepower requirement. Synthetic reservoir performance based on a material balance is the main data source for this project. A forecast of the production of oil as well as the time when tubing strings should be replaced as a function of the cumulative production is proposed.

1.3 Objectives

The objectives of this project are to:

Design natural flow and artificial lift tubing strings for the whole life of a well.

Forecast the production of oil as well as the time when tubing strings should be replaced as a function of both cumulative production and time.

 

1.4 Outline of this Project

The project consists of five (5) chapters. Chapter 1 defines the problem at hand, the method which the project follows and objectives. Chapter 2 presents a literature review of the topic as well as the technical terms that make up the topic. Chapter 3 introduces a thorough review of the material balance equation, methods of predicting primary oil recovery with emphasis on Muskat’s method which has been employed in this report. Application of the Muskat’s method is illustrated with a synthetic reservoir data. Chapter 4 comes up with the natural flow design as well as the artificial lift tubing strings with respect to the set constraints.

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Natural Flow And Artificial Lift For A Solution Gas Drive Reservoir, and acknowledges the contributions of scholars who have previously conducted similar research [REV24799] …

Document Information

  • Format: DOC/PDF
  • Title: Natural Flow And Artificial Lift For A Solution Gas Drive Reservoir:

YOU MAY LOVE THESE (Recommended)

Posted under:

To start a project on Student Teachers Challenges During Their Teaching Practice And Their Solution, follow these guidelines: This research project is aimed at finding the challenges student teachers encountered during their teaching practice and the possible solutions. This is largely due to the strategic importance, concept significance of teaching practice in teacher education programme. This study was conducted in E…

70 Pages 1 - 5 Chapters 8,528 Words DOC/PDF Format Instant Download UPN852

Posted under:

To develop a project on Methods of solution of second order ordinary differential equation involving variable coefficients, follow these approaches: This project delves into the intricate realm of solving second-order ordinary differential equations, aiming to elucidate and demystify the methodologies involved, along with their practical applications. Particular emphasis is placed on the utilization of variation of parameters and exact soluti…

50 Pages 1 - 5 Chapters 13,403 Words DOC/PDF Format Instant Download UPN4842

To undertake a project on Integration Of Artificial Intelligence Into Business Process And Its Impact On Organisational Performance, follow these effective ways: Artificial intelligence is facilitating the resolution of complex problems in computer science, operations research and software development. The purpose of this study is to assess the integration of artificial intelligence into business process and its impact on organizational performance, a cas…

63 Pages 1 - 5 Chapters 7,906 Words DOC/PDF Format Instant Download UPN19490

Posted under:

To write a project on Financial Distress In Source Commercial Bank Reasons, Consequences And Solution, follow these structure: A descriptive study was made about financial distress in some commercial banks using secondary statistics. This research work designed to describe the financial distress in some Commercial Bank in Nigeria. The study also took at the follow objective such as; nature and types of financial distress…

41 Pages 1 - 5 Chapters 5,659 Words DOC/PDF Format Instant Download UPN123

Learn the structure to write the “Effects Of Communication Barriers In Achieving Organizational Goals” Project

To carry out a project on Effects Of Communication Barriers In Achieving Organizational Goals, follow these effective methods: If communication is adequate in organizations, there will be proper coordination between the staff and the management and hence achieving the organizational goals on the other hand, if communication is on adequate, it hampers the smooth running of the affairs of the business and general a lot of …

114 Pages 1 - 5 Chapters 7,841 Words DOC/PDF Format Instant Download UPN1445

Posted under:

To start a project on Effect Of Liquid Flowrate And Gas Flowrate On A Packed Absorption Tower And Repair Of Equipment, follow these guidelines: The purpose of the project is to study the effect of liquid flow rate and gas flow rate on the pressure drop in a packed absorption tower and also to repair and restore the packed absorption tower to good working condition. Trouble shooting revealed that the exit drain value was broken due to ca…

61 Pages 1 - 7 Chapters 8,223 Words DOC/PDF Format Instant Download UPN1213

Posted under:

To develop a project on Determination Of Active Sweets Components Of Common Artificial Sweeteners That Are Used As Replacement For Sugar, follow these approaches: This research investigated how the sweetness of sugar substitute compares to the sweetness of sugar. In this research different percentage solution of sugar, artificial sweetener and natural sweetener (10%, 1%, 0.1% and 0.01%) were prepared. Ten volunteers were gathered for the sensory evaluation…

55 Pages 1 - 5 Chapters 1,268 Words DOC/PDF Format Instant Download UPN367

Posted under:
Banking and Finance (1684) and Finance (1265)

To undertake a project on Detection And Control Of Financial Frauds In Banking System; Problems And Solution, follow these effective ways: Banks deal essentially in cash financial instrument and other documents which are generally of a negotiable and easily transferable in nature. Hence it is very pertinent to say that the exposure of banks to both internal and external fraud is very great. This practice is very common to area invol…

102 Pages 1 - 5 Chapters 14,131 Words DOC/PDF Format Instant Download UPN160

How to structure the “Design And Fabrication Of An Industrial Gas Cooker” Project

To write a project on Design And Fabrication Of An Industrial Gas Cooker, follow these structure: Cooker plays an integral role in oil and gas well pads. They generate the heat necessary for separating the oil, gas and water mixture and to keep the gases in their vapor phase during transportation through pipelines. Industrial cooker typically use a portion of the gas coming out of the ground …

42 Pages 1 - 5 Chapters 5,505 Words DOC/PDF Format Instant Download UPN4641

Learn the structure to write the “Design And Construction Of Gas Leakage Detector With SMS Alerts” Project

To carry out a project on Design And Construction Of Gas Leakage Detector With SMS Alerts, follow these effective methods: This work is on a gas detection system. Gas detector is a device that detects the presence of gases in an area, often as part of a safety system. This type of equipment is used to detect a gas leak. A gas detector can sound an alarm to operators in the area where the leak is occurring, giving the…

45 Pages 1 - 5 Chapters 6,063 Words DOC/PDF Format Instant Download UPN2911

Live Chat