Comparative Study Between Overbalanced And Underbalanced Oil Drilling Methods

Abstract

The technique used worldwide while drilling is known as overbalanced drilling. Which is defined as the drilling process where the hydrostatic pressure used exceeds the formation pressure. This is done with the main purpose of “killing” the well. However, there are numerous problems that accompany overbalanced drilling. Such problems are differential pipe sticking, loss of circulation, formation damage and other problems. A relatively new technique was introduced, known as underbalanced drilling, where the well is being drilled with a hydrostatic pressure less than that of the formation.

Correct and proper execution of such technique eliminates problems associated with overbalanced drilling. More precisely, underbalanced drilling solves the issues of formation damage, differential pressure sticking and loss of circulation. On the other hand, underbalanced drilling has its own problems as well. Additionally, underbalanced drilling increases the rate of penetration and provides other uses discussed in this project. The objective of this paper was to compare between overbalanced and underbalanced drilling and ascertain which method is most suitable in all aspects. Finally, it can be concluded that UBD provides lower drilling costs, increased rate of penetration (ROP) and less hole problems when it was compared to overbalanced drilling of the same formations.

Chapter One

Introduction

1.1 Background Study

The main purpose of drilling vertical or horizontal wells is to produce maximum recoverable oil at minimum cost. Traditionally, wells have been drilled overbalance with the hydrostatic pressure of the drilling fluid greater than the pressure in the formation. Unfortunately, drilled wells with overbalance are subject to formation damage with varying degree of severity, depending upon the drilling conditions. This is mainly due to the invasion of drilling fluids during drilling operations. The formation impairment or skin due to drilling fluid invasion around the well bore reduces well productivity. This is especially true for wells completed either open hole or with slotted liner due to the difficulty to undertake any stimulation job to alleviate formation damage problems. (S.Z. Jilani et al.)
Nowadays, horizontal wells are preferred over vertical wells because they offer a net productivity enhancement as well as an increase of the contact area with the reservoir. However, formation damage is more critical to horizontal wells because these wells have such long exposed interval that stimulation jobs are not efficient and feasible. (S.Z. Jilani et al.)

Drilling operation is considered as the primary initiator of formation impairment as virgin formation comes first time in contact with a foreign fluid, i.e. drilling mud, which invades the formation and plugs the pores around the well bore. Although drilling fluids are presently being designed in such a way to minimize solid and fluid invasion into the formation.

In this project we would be taking a look at some comparative analysis done between two drilling operational techniques; the conventional Overbalance drilling technique (OBD) and the Underbalance drilling technique (UBD).

1.2 Overbalance Drilling Operation:

Many definitions have been laid down for a conventional overbalance drilling operation usually referred to as conventional drilling. These definitions categorize the drilling fluid design used for an overbalance drilling operation.

The amount of pressure (or force per unit area) in the wellbore that exceeds the pressure of fluids in the formation is also considered as overbalance. This excess pressure is needed to prevent reservoir fluids (oil, gas, water) from entering the wellbore.. However, excessive overbalance can dramatically slow the drilling process by effectively strengthening the near-wellbore rock and limiting removal of drilled cuttings under the bit.

In conventional overbalanced drilling operations, the hydrostatic pressure exerted by the drilling fluid in the well is designed to exceed the pressure of the hydrocarbon fluids in the reservoir. Since the pressure in the hole is higher than the pressure in the rock fluid therefore drilling fluid can lose into the formation. These losses cause damage to the near well-wall area resulting in reduced production, experience show that even a short exposure to overbalanced conditions can severely impair the productivity of the well.

In addition, high overbalance pressures coupled with poor mud properties can cause differential sticking problems in which the drill pipe is pressed against the wellbore wall and as a result the pipe becomes stuck to the wall. Because reservoir pressures vary from one formation to another, while the mud is relatively constant density, overbalance varies from one zone to another. (Schlumberger Oilfield Glossary, 2014)

Figure 1.1 illustrates an overbalance drilling operation. As we can see, the drilling fluid being circulated plugs the pores causing drilling fines to migrate and invade the formation.

A simple equation to illustrate this condition of drilling can be given as:

Pm ˃ Pf

Figure 1.1 : Conventional overbalance drilling (available in the complete material)

1.3 Underbalance Drilling Operation:

The growing number of depleted reservoirs around the world and the increasing necessity to recover hydrocarbons more efficiently has been forcing the oil and gas industry to continuously improve its drilling technology. Currently, the combination of drilling techniques that were conceptualized more than 100 years ago, have with recent technological innovations ended up in specialized drilling techniques. These techniques, when properly designed and executed, allow drilling a well more economically, safely, and successfully in almost any given environment. One such technique is called underbalanced drilling (UBD).

Underbalanced drilling, or UBD, is a procedure used to drill oil and gas wells where the pressure in the wellbore is kept lower than the fluid pressure in the formation being drilled. As the well is being drilled, formation fluid flows into the wellbore and up to the surface. This is the opposite of the usual situation, where the wellbore is kept at a pressure above the formation to prevent formation fluid entering the well. In such a conventional “overbalanced” well, the invasion of fluid is considered a kick, and if the well is not shut-in it can lead to a blowout, a dangerous situation. In underbalanced drilling, however, there is a “rotating head” at the surface – essentially a seal that diverts produced fluids to a separator while allowing the drill string to continue rotating guaranteeing safety. (Wikipedia.org)

Though not as common as overbalanced drilling, underbalanced drilling is achieved when the pressure exerted on the well is less than or equal to that of the reservoir. Performed with a light-weight drilling mud that applies less pressure than formation pressure, underbalanced drilling prevents formation damage that can occur during conventional or overbalanced drilling processes.

The negative differential pressure obtained during underbalanced drilling between the reservoir and the wellbore encourages production of formation fluids and gases. In contrast to conventional drilling, flow from the reservoir is driven into the wellbore during underbalanced drilling, rather than away from it.

Figure 1.2 describes an underbalance drilling operation showing less hydrostatic drilling fluid being circulated and we can see flow from the reservoir as well as formation fines into the wellbore as drilling operation is carried out.

A simple equation to illustrate the condition of drilling can be given as:

Pf > Pm

Figure 1.2 : Underbalanced Drilling (available in the complete material)

Although initially more costly, underbalanced drilling, also known as managed-pressure drilling, reduces common conventional drilling problems, such as lost circulation, differential sticking, minimal drilling rates and formation damage. Additionally, underbalanced drilling extends the life of the drill bit because the drilling gases cool the bit while quickly removing cuttings.

To establish pressure control, a rotating control head with a rotating inner seal assembly is used in conjunction with the rotating table. An important factor to successful underbalanced drilling, drilling and completion operations must remain underbalanced at all times during operations. To accomplish this, pre-planning and onsite engineering are critical to the success of underbalanced drilling procedures.

Typically used for only a section of the entire drilling process, underbalanced drilling cannot be used in most shale environments.

1.4 Underbalance Gases

Gases used for underbalance include air, nitrogen and natural gas. Although it is not typical, if natural gas is recovered from the well, it can be reinjected into the well to establish underbalance, resulting in the most cost-effective solution for underbalanced drilling.

Commonly used in underbalance operations, nitrogen is preferred for its somewhat low cost of generation, scale of control and minimal potential for downhole fires. While pure nitrogen can be purchased, it is cost-prohibitive. Therefore, nitrogen is more commonly produced onsite with a membrane unit, resulting in a 95% level of purity.

1.5 Underbalance Techniques

There are four main techniques to achieve underbalance, including using lightweight drilling fluids, gas injection down the drill pipe, gas injection through a parasite string and foam injection.

Using lightweight drilling fluids, such as fresh water, diesel and lease crude, is the simplest way to reduce wellbore pressure.

The method of injecting gas down the drillpipe involves adding air or nitrogen to the drilling fluid that is pumped directly down the drillpipe. Advantages to this technique include improved penetration, decreased amount of gas required, and that the wellbore does not have to be designed specifically for underbalanced drilling.

In performing the gas injection via parasite string, a second pipe is run outside of the intermediate casing. While the cost of drilling increases, as does the time it takes, this technique applies constant bottom hole pressure and requires no operational differences or unique MWD systems. Figure 1.3 shows a pictorial representation of the above procedure.

Figure 1.3 : Gas injection via parasite string (available in the complete material)

A less common underbalanced application, nitrogen foam is less damaging to reserves that exhibit water sensitivities. While the margin of safety is increased using foams, the additional nitrogen needed to generate stable foam makes this technique cost prohibitive. Additionally, there are temperature limits to using foam in underbalanced drilling, limiting using the technique to wells measuring less than 12,000 feet deep.

1.6 Statement of Problem

Due to the growing technologies associated with drilling operations, it is pertinent to look for affordable, convenient and more productive alternatives. In this project, we would analyze both drilling techniques and see its effect on various formations to be able to make a better choice for each drilling scenario.

1.7 Aims and Objectives

In view of the comparative analysis of overbalance and underbalance drilling operations in the Oil and Gas industry, this project work seeks to investigate the following:

To have an understanding of both the underbalance and overbalance drilling operations.

To know reservoirs suitable for either underbalance or overbalance drilling operations.

To also know the various effects and challenges associated with these operations.

 

1.8 Scope and Limitation

The scope of this study is to comparatively analyze underbalance and overbalance drilling operations with emphasis on reservoir types.

1.9 Methodology

In the course of the project, vital information was obtained from the library, review of related literatures, internet surfing, textbooks, petroleum journals and these formed the basis for analysis of both underbalance and overbalance drilling operations.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Comparative Study Between Overbalanced And Underbalanced Oil Drilling Methods, and acknowledges the contributions of scholars who have previously conducted similar research [REV87562] …

Document Information

    • Format: DOC/PDF
    • Title: Comparative Study Between Overbalanced And Underbalanced Oil Drilling Methods:

YOU MAY LOVE THESE (Recommended)

  • To start a project on Use Of Coconut Fibre As Standard pH Enhancer For Drilling Mud Formulation, follow these guidelines: In the present day oil and gas industry, the chemicals used as pH controller are usually imported at an exorbitant price – which take a large part of the drilling cost and have ripple effect on the economy of the Nation. It is however necessary to source for an alternative by the use of local mat…

    46 Pages 1 - 5 Chapters 9,120 Words DOC/PDF Format Instant Download UPN87626

  • Techniques for writing the “Impacts Of Oil Price Volatility On Economy” Project

    INTRODUCTION 1.1 Background to the Study Economic growth plays a key role in industrial innovation (Malatyali, 2016). The first fluctuations in crude oil prices that occurred in 1973s have made economists to view sudden movements in the oil price as a fundamental source of economic fluctuations, for example, Hamilton (2005) suggests that in the last few decades, nine of the ten recessions in the USA were preceded by large positive incr […]

    49 Pages 1 - 5 Chapters 7,624 Words DOC/PDF Format Instant Download UPN66663

  • Techniques for writing the “Impact Of Oil Price Changes On The Economic Growth” Project

    To develop a project on Impact Of Oil Price Changes On The Economic Growth, follow these approaches:     This study examines the impact of oil price changes on the economics growth of Nigeria; this explains that the changes have a negative impact on the GDP (Gross Domestic Product). This change is also known as price volatility. An economic analysis was employed using the method of ordinary lea…

    80 Pages 1 - 5 Chapters 10,268 Words DOC/PDF Format Instant Download UPN66662

  • Writing strategies for the “Refining Of Vegetable Oil With Enugu Coal” Project

    To undertake a project on Refining Of Vegetable Oil With Enugu Coal, follow these effective ways: This project was carried out using acid activated coal from Enugu coal and the production of ve4getablew oil was monitored using spectrophotometer to measure the absorbance. It was also perform to check the suitability of activated Enugu coal as a bleaching agent for palm oil. The Enugu coal samp…

    83 Pages 1 - 5 Chapters 12,030 Words DOC/PDF Format Instant Download UPN62920

  • Steps for writing the “Refining Of Soya Bean Oil” Project

    To write a project on Refining Of Soya Bean Oil, follow these structure: This project work studied the refining of crude soya bean oil extracted from soya bean seed using alkali /caustic refining method. The work was carried out using phosphoric acid for the degumming /pretreatment process and sodium hydroxide for the neutralization /refining of the oil. Certain tests…

    79 Pages 1 - 5 Chapters 1,499 Words DOC/PDF Format Instant Download UPN62916

  • Guide for writing the “Real Exchange Rate And Non Oil Export” Project

    INTRODUCTION 1.1 BACKGROUND OF THE STUDY Since exportation has a special share in the economic growth of many advanced and developing countries; as far as making those countries as the strongest countries, the effective factors; in turn, could pave way for progress of countries, particularly the developing countries. Since increase or decrease in currency exchange rate leads to the decrease or increase in export. Nigeria is endowed wit […]

    47 Pages 1 - 5 Chapters 5,383 Words DOC/PDF Format Instant Download UPN63857

  • Guide for writing the “Printing images and their methods of Production” Project

    LETTER PRESS PRINTING 1.1 THE BASIC PRINCIPLE: Letterpress is a highly versatile printing process. It is adaptable to both short and long printing runs, from a few hundreds to several millions of printed impressions. In letterpress printing the image area of the printing surface stands in relief, raised above the surrounding non-image areas. Ink is applied to the image areas with a roller and is transferred to paper under pressure. Let […]

    57 Pages 1 - 5 Chapters 8,677 Words DOC/PDF Format Instant Download UPN63061

  • To carry out a project on Oxidative Stress Status Of Rats Fed On Oil Bean Seed Meal, follow these effective methods: This study was on oxidative stress status of rat fed with Pentraclethra macrophylla, otherwise known as African oil bean seed oil in English or Ugba in Igbo. Sixteen male rats were distributed into four groups. 1 (control), then group 2, 3, and 4 as test groups. They were fed with their formulate…

    52 Pages 1 - 5 Chapters 1,709 Words DOC/PDF Format Instant Download UPN62086

  • To start a project on Methods of solution of second order ordinary differential equation involving variable coefficients, follow these guidelines: This project delves into the intricate realm of solving second-order ordinary differential equations, aiming to elucidate and demystify the methodologies involved, along with their practical applications. Particular emphasis is placed on the utilization of variation of parameters and exact soluti…

    50 Pages 1 - 5 Chapters 13,403 Words DOC/PDF Format Instant Download UPN66732

  • To develop a project on Metaproteomics Methods To Discover Ecosystem Function In Aquatic Environment, follow these approaches: System approaches to elucidate ecosystem functioning constitute an emerging area of research within microbial ecology. Such approaches aim at investigating all levels of biological information (DNA, RNA, proteins and metabolites) to capture the functional interactions occurring in a given ecosyst…

    63 Pages 1 - 5 Chapters 11,145 Words DOC/PDF Format Instant Download UPN66636

Live Chat