1.0 INTRODUCTION
As the zeal for change over on public power supply and stand-by generator increases, Engineers have researched deep into the different ways and methods of achieving power change-over both manual and automatic types.
It may not be considered a serious issue in some places where supply is up-to 90% constant or where intermittent outage causes no great damage. However, places like the business centers, industrial areas, and even cold rooms need almost 100% power supply. So in this case there is need to provide a stand-by power supply in the event of power outage. The important thing is to make sure an effective stand-by power supply which is constant and reliable is provided to eliminate the problem of long time outage.
Before, this time, changeovers are operated manually, there by making it difficult for power continuity without a time wastage. This is because an operator must always be available at any point in time. This manually operated change-over switch has two switchable positions-(main and generator) an arm is also provided from where the operator can have access to the switching. Here, the effectiveness, i.e. the fastness of the switching anytime power needs to be changed is slow, and largely depends on the operator, which means that the system will be in-effective whenever the operator is not available.
The second generation of change over switch were made semi-automatic in which the main power supply directly powers the contactors. This arrangement is made in such a way that if the main power supply fails, the contactors will all drop, leaving the supply to the generator position. The effectiveness of the system will now depend on the operator to start the generator on time.
The main problem suffered by the manual and semi-automatic systems is that the operator must have to be continuously be on duty for it to be very effective. This depends on fully closed loop system to operate.
With more research by the scientists and engineers to improve on the earlier ones, the present day technology has made it possible for the change over switch to be more effective and fast with less labour more improvements has be made in terms of number of designs, using the closed loop system at feed back control. Some also use comparators, logic circuits and electronics timers to achieve the task.
The design of this project is in such a way that control or switching is done without any noticeable sign. It uses a combination of comparators digital switches (relays) and electromagnetic switches to achieve a very fast and effective change-over in the case of power failure. This type of switch does not depend on any operator to function well.

1.1 BACK GROUND
The background to this project work is traced to the in tense demand of the populace and industries, residential homes, and many more demand for change of power supply switch for effective and continuity of power supply without a notice interruption or delay in such process to any alternative supply if the main supply goes off.
Earlier to this time, such process is manually operated or not in used at all. The manual type which is always strenuous and time delayed was a little bit useful but not to a satisfactorily level. More level and expenses are always required to meet up with the time factor and effectiveness required of this process of change over. These expenses and labour could not be afforded by some individuals and industries that needed to practice this change over.
Regard to this solutions were suggested to improve the process, so the idea of change or transforming the manual operated to automatic was discovered and engineers went into work immediately and came up with this automatic change over switch. But the demand for this equipment was much that something must be done to meet up with increasing demand. But this increase in demand topples the decrease in supply due to the cost of securing this equipment. The students went into this project to find out how mass production could reduce the increase in demand or meet up with the demand. They now decide to go further single handedly produce this work and see how far it can be done without the help of industrial machine.
After the approval, we went into market survey and evaluation of the components, after a good study of the circuit diagram. The rating of the equipment was also considered. A lot of considerations were made based on the fluctuating nature and inconsistency of our main supply source. The cost of procuring the system was put together and found out that it is less cost, and easy in operation. The users can experience change over supply without an input or extra labour.
With all these considerations and studies we decided to put together this project.

1.2 AIMS / OBJECTIVES
The primary aim and objective of this project work among other things are:
a) To see how the problems of power change over can be solved with less capital and less labour.
b) To make sure that an average person can reach to the equipment by the evaluation of the cost of production of this project.
c) To check the effectiveness of this work and how fast it can work without risk or extra labour or shock to personnels.
It is also aimed at improving the availability of power supply at any point in time with this equipment, due to its automatic nature. This is because the automatic nature of this project makes it un noticeable at the out put or at the load.
This equipment when used will solve the problem of power outage suffered or delayed in change over suffered by many industries and business centres where power failure are greatly felt, and can cause a lot of regrets, because information are lost severally because of power failure, especially in business centres. This work therefore remedies these problems but can be regrettable.

1.3 SCOPE OR LIMITATION
The scope or range of this project work is as wide as 2.5KVA as the rating. This means that it is capable of with standing any input of the range from any source especially generator sets and can give an output of 220-230Volts.
With this rating of 2.5KVA and a voltage of 230Volts, this work can stand any load.
The limitation is within prescribed output /input range. In other words any increase in the input could cause some damage to the components.
Again, a circuit breaker was provided to protect the circuit from damage due to voltage surge or output fault or load fault.
The current rating is of 10.9Amps which is enough to withstand any load within the range.

1.4 DEFINITION OF TERMS
Generally, a change over switch is a system which could be manually or automatically operated, that changes one source of power supply to another source in the case of failure from either of the two sources.

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Construction Of Automatic Change Over Switch, and acknowledges the contributions of scholars who have previously conducted similar research [REV63992] …

Table of Content

Title Page
Certification
Dedication
Acknowledgement
Table Of Contents

 

Chapter One
1.0 Introduction

1.1 Back Ground
1.2 Aims/ Objectives
1.3 Scope Of Limitation
1.4 Definition Of Terms

Chapter Two
2.0 Literature Review

2.1 The Power Transformer
2.2 The Relay
2.3 Contactors
2.4 Switches
2.5 Capacitors
2.6 Diode
2.7 Indicator Lights (Light Emitting Diodes)
2.8 Circuit Breaker
2.9 Voltmeter
2.10 Power Supply

Chapter Three
3.0 Construction

3.1 Circuit Diagram
3.2 Block Diagram
3.3 Contactor Wiring Diagram
3.4 Diagram Of The Casing

Chapter Four
4.0 Testing And Evaluation

4.1 Testing
4.2 Evaluation
4.3 Trouble Shooting And Remedy
4.4 Maintainability

Chapter Five
5.0 Conclusion

Reference

Document Information

    • Pages: 43 Pages
    • Chapters: 1 – 5 Chapters
    • Words: 5,965 Words
    • Format: DOC/PDF
    • Time: Instant Download
    • Title: Construction Of Automatic Change Over Switch:

YOU MAY LOVE THESE (Recommended)

  • How to write the “Impact Of Change Management In Banking Industry” Project

    To start a project on Impact Of Change Management In Banking Industry, follow these guidelines: The research topic of this study is the impact of change management in Nigerian Banking Industry, A study of United Bank for Africa (UBA) station Road, Enugu. The research was a descriptive research, the researcher made use of primary sources and secondary sources of data. The primary sources of …

    79 Pages 1 - 5 Chapters 1,698 Words DOC/PDF Format Instant Download UPN62286

  • Techniques for writing the “Home Control Switch Automation Using GSM Communication” Project

    To develop a project on Home Control Switch Automation Using GSM Communication, follow these approaches: The advantage of cellular communication like GSM technology is a potential solution for such remote controlling activities. GSM-SMS technology can be used to control household appliances from remote places. Remotely, the system allows the home owner to monitor and control his house appliances via…

    62 Pages 1 - 5 Chapters 7,123 Words DOC/PDF Format Instant Download UPN63940

  • To undertake a project on Design And Construction Of Dark Activated Switch For Street Light, follow these effective ways: A street lighting is any electrical lighting that is fixed outside house for the illumination of such environment or a Street light is a raised source of light on the edge of a road or walkway, which is turned on or lit at a certain time every night. Automatic street light controller will automa…

    44 Pages 1 - 5 Chapters 7,263 Words DOC/PDF Format Instant Download UPN66158

  • Steps for writing the “Design And Construction Of Automatic Phase Selector” Project

    INTRODUCTION As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied. Hence, the continuation of the unsettled yearns for sufficient power. Consequently, the p […]

    51 Pages 1 - 5 Chapters 5,437 Words DOC/PDF Format Instant Download UPN63942

  • To write a project on Design And Construction Of Automatic Fence Light Controller, follow these structure: The very fundamental reasons behind this project assignment is to expose student to the very important aspect of private and independent research work not only theories but also subsequent translation of the theoretical research work into a particular function system. The project construction of …

    25 Pages 1 - 5 Chapters 2,587 Words DOC/PDF Format Instant Download UPN63990

  • To carry out a project on Design And Construction Of Automatic Change-Over For Three Phases, follow these effective methods: The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outag…

    50 Pages 1 - 5 Chapters 6,521 Words DOC/PDF Format Instant Download UPN64102

  • To start a project on Design And Construction Of An Intelligent Vehicle Over Speed Detection And Reporting System Using Arduino And GSM, follow these guidelines: This device is capable of detecting over speed vehicles running on road, Over speeding vehicle make lot of nuisance sometimes also leading to loss of lives and other damages. Project has two parts hardware part and software part. The central and intelligent unit of the model is arduino. Hardware …

    40 Pages 1 - 5 Chapters 5,146 Words DOC/PDF Format Instant Download UPN64714

  • To develop a project on Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism, follow these approaches: This project presents the concept of a control system into an automatic water pump controller. One of the motivations for this project is the need to bring a solution to the problem of water shortage in various places eliminating the major culprit, waste of water during pumping, dispensing into o…

    65 Pages 1 - 5 Chapters 7,929 Words DOC/PDF Format Instant Download UPN66459

  • Writing strategies for the “Design And Construction Of An Automatic Water Dispenser” Project

    To undertake a project on Design And Construction Of An Automatic Water Dispenser, follow these effective ways: A water dispenser is a system or a machine which is designed and capable of responding to an instruction or request made by the user in other to dispense a particular liquid. This paper developed an automatic liquid dispenser that eliminates manual operation of the dispenser’s pumps. This is achi…

    47 Pages 1 - 5 Chapters 7,542 Words DOC/PDF Format Instant Download UPN65201

  • To write a project on Design And Construction Of An Automatic Voltage Stabilizer, follow these structure: In the world today, the use of power supply in electronics equipment and gadgets has increased and it is still increasing. These power supplies are not stable as required by these electronics. This arise the need for the power stabilization as to overcome this problem This project handles this pr…

    34 Pages 1 - 6 Chapters 3,783 Words DOC/PDF Format Instant Download UPN63979

Live Chat