Design Of An Artificial Lift System For Optimization Production For Well J-50

Abstract

This study focuses on the design of an artificial lift system and production optimization of a new horizontal well in a Niger Delta field. Two methods have been employed in this study; the manual method and the use of PROSPER (Production System Performance). The first method is the analytical method of ESP design and the second one is the software. The sensitivity analysis is carried out on the well and it is concluded that at increasing water cut and constant reservoir pressure the water rate increases which deteriorates ESP performance which will lead to redesigning another pumping system that will handle the current reservoir conditions.

Chapter One

Introduction

1.1 Background of Study

Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy Information Administration) stated that the world consumption of crude oil daily is 85.64 million barrels, which is equivalent to 2 liters of oil per day per person.

Generally, oil can be produced from the reservoir by the stored energy of the oil in the reservoir. This energy is obtained by the difference between the reservoir and wellbore pressures. If this difference is high, the well will be capable of producing naturally. Most oil wells worldwide produce naturally in their early lives until there is a decrease in the reservoir pressure which leads us to enhanced oil recovery.

When a well has been producing for a period of time, there will be decrease in reservoir pressure and as a result the difference between reservoir and wellbore pressure will decline. So, the energy in the well will not be able to lift oil up to surface, or it might lift oil to the surface but in less than economic volume. At this stage, artificial lift is introduced and it can be utilized to overcome this issue by reducing the wellbore pressure. This reduction will bring back the essential difference between the reservoir and wellbore pressure so oil can be extracted and lifted up to the surface.

One of the most important roles of artificial lift is to maximize the production rate from flowing wells. Artificial lift can be divided into two types, based on lifting mechanism: gas lifting and pumps. The gas lifting method makes use of a compressed gas that is injected from the surface to certain points in the tubing. This gas will lower the density of the fluid column in the tubing causing a reduction in the wellbore pressure and therefore increasing production. The pumping method, on the other hand, involves setting the pump at a certain depth inside the tubing that will cause it to be submerged below the liquid level. This pump will lower the wellbore pressure and hence increase the drawdown, thereby boosting production. The most common artificial lift methods used are as follows:

Electrical Submersible Pump (ESP)

Sucker Rod Pumps (SRP)

GasLift (GL)

Plunger Lift Pumps (PLNG)

Progressive Cavity Pumps (PCP)

Hydraulic Pumps (HP)

 

Bearden (2007), stated that ESP is the most competent and consistent method of artificial lift when moderate to high volume of oil needs to be lifted from the well. He also estimated the lifting capacity of ESPs to be as low as 150 barrels per day and as high as 150,000 barrels per day. Fig 1.1 below shows the various types of artificial lifts and their utilization worldwide.

Fig 1.1 Artificial lift types and their utilization.

1.2 Statement of Problem

A major challenge faced in lifting oil and gas from the reservoir through the production tubing to the surface facilities is an unnecessary production decline which is as a result of low reservoir pressure and it is a serious problem in the petroleum industry today. This decline may be as a result of mismanagement of wells, excessive pressure drops along the production system, oversized or undersized tubing, and improper perforation method etc. A change in any component of the production system may lead to a change in the pressure drop behavior of the other components since the various components are interactive.

This study shows the design of an ESP artificial lift system and production optimization of Well J-50 is a new horizontal well in a Niger Delta field. In other to optimize production and produce about 10,000bopd as the desired rate of production, ESP was recommended to be designed for the well to achieve optimum production by.

1.3 Methodology

The method to be used for this work is the analytical method of ESP design and using the software PROSPER. In the analytical method the following steps will be taken to design the ESP design;

Collection of basic data

Calculation of production capacity

Gas calculations

Determination of Total Dynamic Head (TDH)

Pump-type selection and calculation of pump stages

Optimum size of components

Electric cable selection

 

In using PROSPER (Production System Performance Analysis Software) to design the ESP system the following steps will be followed;

Using existing PVT and VLP data has a basis of new analysis.

Calculating pump intake and outlet pressures.

Designing an ESP system

Evaluating pump operating point sensitivities.

Calculate a flowing gradient for an ESP equipped well.

 

1.4 Aim and Objectives

The major aim of carrying out this research is to optimize production for well J-50 by designing an artificial lift system while its objectives are as follows;

To design an artificial lift system (ESP) for a well that the production rate has declined.

To boost production for a producing well and increase revenue.

To describe and design an operation of ESP for a given well.

 

1.5 Significance of study.

The significance of this study in the petroleum industry is to show the importance of designing ESP for a new well and also the use of artificial lift in maximizing oil production.

1.6 Scope and limitations of Research

The scope of this research is limited to the use of manual method and PROSPER in designing an ESP for artificial lift so as to optimize production. There are other softwares that can also be used in designing an ESP System but for this project PROSPER is used due to availability. The study is conducted in a Niger Delta reservoir and a suitable ESP design will be done to increase the well production potential.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design Of An Artificial Lift System For Optimization Production For Well J-50, and acknowledges the contributions of scholars who have previously conducted similar research [REV87571] …

Document Information

    • Format: DOC/PDF
    • Title: Design Of An Artificial Lift System For Optimization Production For Well J-50:

YOU MAY LOVE THESE (Recommended)

  • To start a project on Web Search Optimization Using Deep Learning Techniques, follow these guidelines: As digitalization is gradually transforming reality into Big Data, Web search engines and recommender systems are fundamental user experience interfaces to make the generated Big Data within the Web as visible or invisible information to Web users. In addition to the challenge of crawling and ind…

    79 Pages 1 - 5 Chapters 14,933 Words DOC/PDF Format Instant Download UPN65170

  • To develop a project on Use Of Local Pigments And Extenders For Formulation And Production Of Emulsion Paint, follow these approaches: The major aim of this project research work is to produce emulsion paint from locally sourced pigment & extenders. The materials used for the production was of local source. The major raw materials used for the production of the emulsion paint: water, titanium iv oxide, calcium carbonate, kao…

    94 Pages 1 - 6 Chapters 11,492 Words DOC/PDF Format Instant Download UPN62935

  • Writing strategies for the “Use Of Cowpea For Shito Production” Project

    To undertake a project on Use Of Cowpea For Shito Production, follow these effective ways: This research work examined the use of cowpea for shito production, to determine the cost of the shito, to access the sensory attribute in terms of the taste, aroma and colour, to determine the overall acceptability of cowpea shito, to bring varieties of shito into the market, to determine the pr…

    59 Pages 1 - 5 Chapters 8,100 Words DOC/PDF Format Instant Download UPN63932

  • To write a project on Urbanization A Problem To Food Production And Agricultural Development, follow these structure: In this research on Urbanization – A problem to Food Production and Agricultural development in Enugu State, effort were made to address issues that are related to the problems, cause, effects, challenges, practice and solutions to the future management as it Concerns man and his environment and …

    70 Pages 1 - 5 Chapters 9,299 Words DOC/PDF Format Instant Download UPN62710

  • To carry out a project on Effects Of Sugar Cane Bagasse Ash As Suplementary Cementitious Material In Production Of Concrete, follow these effective methods: Sugarcane Bagasse is the fibrous residue leftover when sugarcane is squeezed for its juice. Bagasse ash is obtained by subjecting Bagasse to calcinations using furnace. This work is aimed tat using Bagasse Ash as a replacement in the production of concrete. The bagassewas collected from dumped in…

    62 Pages 1 - 5 Chapters 10,307 Words DOC/PDF Format Instant Download UPN64120

  • How to write the “Role Of Purchasing In Production” Project

    1.0 INTRODUCTION The fundamental goal of every business organization is profitability and survivability business environment is very dynastic and unpredictable hence the business manager tries to adopt and adjust to their changes so as to provide insulation against some unforeseen situation product modification is the future of any business and without a continuous of new product such state may die prematurely. According to Oxford adva […]

    50 Pages 1 - 5 Chapters 6,009 Words DOC/PDF Format Instant Download UPN62876

  • 1.0 INTRODUCTION 1.1 GENERAL OVER VIEW In recent years materials functions has experienced total information by business management. It is the least of the responsibilities and authorities for making major contributions to projects and it has yielded positive result in the business world. In most business operations today, the cost of materials has an important role in fixing the price of the finished product This is because when mater […]

    102 Pages 1 - 5 Chapters 9,007 Words DOC/PDF Format Instant Download UPN62869

  • To start a project on Role Of Agriculture Extension In Increasing Food Production As A Strategy In Reducing Poverty, follow these guidelines: The majority of agricultural producers in Nigeria still use the traditional approach in crop production with technological change very slow and minimal. In view of this, Agricultural Extension Services have been adopted by the government as a major agricultural transformation strategy. Neverthele…

    81 Pages 1 - 5 Chapters 20,305 Words DOC/PDF Format Instant Download UPN66724

  • Techniques for writing the “Production Of Yam Flour” Project

    To develop a project on Production Of Yam Flour, follow these approaches: The project dealt on the production of yam flour from yam chips. The yams were peeled and washed, 100grams samples coded sample A to G were subjected to two different drying conditions. Some were dried using the sun drying method while the others were dried through oven drying method kept at cons…

    60 Pages 1 - 5 Chapters 17,080 Words DOC/PDF Format Instant Download UPN62913

  • Writing strategies for the “Production Of Starch From Cassava” Project

    To undertake a project on Production Of Starch From Cassava, follow these effective ways: The fresh cassava were sources from Idodo in Nkanu Local Government of Enugu state. The weight of the cassava tuber were taken to be 31.50kg. After peeling and washing, it was divided into two equal parts which was 21.13kg for production of sample A and sample B respectively (edible and textile s…

    55 Pages 1 - 6 Chapters 5,756 Words DOC/PDF Format Instant Download UPN62892

Live Chat