Material Balance Application For Brownfield Development

Abstract

The need to re-develop one of the Brown fields located in the Niger Delta area of Nigeria was necessitated by the fact that there are still three undeveloped reservoirs in the field.

A total of six stacked reservoirs, A100 to A600 (all oil bearing with associated gas) were penetrated between 8552 ftss and 10652 ftss by APV-1 well. Reservoir blocks A200 and A600 are the largest in the field accounting for 77% of the total field STOIIP. The well was completed with a Two String Multiple (TSM) on the two levels, with the short string producing from the A200 reservoir and the long string producing from the deeper A600 reservoir, A300 behind the sleeve.

The purpose of this research is to identify the best developmental plan to produce the reservoirs, either with a TSM completion or with a Smart well completion based on the economics. There are many single well fields in the Niger Delta area of Nigeria that have not been optimally produced, hence this study seeks to maximize the life of this field.

The reservoirs were simulated and production forecast carried out amounted to 14.55 MMstb for a period of 16 years.

After economic analysis was performed, the Net Present Value for the TSM and the Smart well completion were US $MM 241.9 and 248.88 respectively and an Internal Rate of Return of 155% and 202% respectively, hence the Smart well development plan is recommended.

 

Chapter One

1.0 Background

Petroleum reserves are declining, and fewer noteworthy discoveries have been made in recent years (Abdus, 1990). The need to increase recovery from the vast amount of remaining oil and to compete globally require healthier reservoir management practices (Abdus et al, 1994).

However, technological developments in all areas of petroleum exploration and exploitation, along with fast increasing computing power, are providing the tools to better develop and manage reservoirs to maximize economic recovery of hydrocarbons (Abdus, 1990).

A reservoir’s life begins with exploration, which leads to discovery; reservoir delineation; field development; production by primary, secondary and tertiary means; and abandonment (Figure. 1.1).

Sound reservoir management is the key to successful operation of the reservoir throughout its entire life. It is a continuous course, unlike how the baton is passed in traditional E&P organizations (Abdus et al, 1994).

Reservoir Management is all about excellence in the Operate phase of an E&P project life cycle. This is the only phase (Operate) that earns income, to provide the return on investment and it is the longest of the four (4) E & P business phases (Exploration, Appraisal, Development and Operate) spanning decades. (Shell WRM Operational Excellence, 2010).

Complete reservoir management requires the use of both human and technological resources for maximizing profits (Abdus et al, 1994). It requires good coordination of geologists, geophysicists, production, and petroleum engineers to advance petroleum exploration, development, and production. Also, technological advances and computer tools can facilitate better reservoir management as well as enhance economic recovery of hydrocarbons. Even a 11 small percent increase in recovery efficiency could amount to significant additional recovery and profit.

These incentives and challenges provide the motivation to sound reservoir management. Reservoir simulation is the way by which one uses a numerical model of the geological and petrophysical characteristics of a hydrocarbon reservoir to analyze and predict fluid behavior in the reservoir over time.

In its simple form, a reservoir simulation model is made up of three parts:

A geological model in the form of a volumetric grid with face properties that describes the given porous rock formation;

A flow model that defines how fluids flow in a porous medium, typically given as a set of partial differential equations expressing conservation of mass or volumes together with suitable closure relations; and

A well model that describes the flow in and out of the reservoir, including a model for flow within the well bore and any coupling to flow control devices or surface facilities (Lie, 1994).

 

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Material Balance Application For Brownfield Development, and acknowledges the contributions of scholars who have previously conducted similar research [REV87604] …

Document Information

    • Format: DOC/PDF
    • Title: Material Balance Application For Brownfield Development:

YOU MAY LOVE THESE (Recommended)

  • To start a project on Work-Life Balance As A Strategy For Improving Organizational Performance, follow these guidelines: This work examined Work-Life Balance as a strategy for improving organizational performance. Balancing the demands of profession and personal life has remained a growing concern for both employers and employees of deposit money banks which in turn has effect on organization’s stability which also…

    60 Pages 1 - 5 Chapters 12,296 Words DOC/PDF Format Instant Download UPN64089

  • To develop a project on Use Of Instructional Material And Its Effects On The Academics Achievement Of The Students, follow these approaches: This study determined the use of instructional materials and the effects on students academic achievement, a case study of Enugu State College of Education (Technical). The use of instructional material cannot be ignore in our educational programs. It is the major instrument used in impacting kno…

    71 Pages 1 - 5 Chapters 9,734 Words DOC/PDF Format Instant Download UPN62285

  • To undertake a project on Effects Of Sugar Cane Bagasse Ash As Suplementary Cementitious Material In Production Of Concrete, follow these effective ways: Sugarcane Bagasse is the fibrous residue leftover when sugarcane is squeezed for its juice. Bagasse ash is obtained by subjecting Bagasse to calcinations using furnace. This work is aimed tat using Bagasse Ash as a replacement in the production of concrete. The bagassewas collected from dumped in…

    62 Pages 1 - 5 Chapters 10,307 Words DOC/PDF Format Instant Download UPN64120

  • Steps for writing the “Shelving Of Library Material In College Libraries” Project

    To write a project on Shelving Of Library Material In College Libraries, follow these structure: This research work examined shelving of library materials in college libraries with Imo State Polytechnic, Umuagwo and FECOLART as comparative study. Data was collected through a combination of questionnaire and documentary sources. The questionnaire, which was the major instrument for data colle…

    43 Pages 1 - 5 Chapters 5,253 Words DOC/PDF Format Instant Download UPN63853

  • Guide for writing the “Role Of Material Management In Production Activities” Project

    1.0 INTRODUCTION 1.1 GENERAL OVER VIEW In recent years materials functions has experienced total information by business management. It is the least of the responsibilities and authorities for making major contributions to projects and it has yielded positive result in the business world. In most business operations today, the cost of materials has an important role in fixing the price of the finished product This is because when mater […]

    102 Pages 1 - 5 Chapters 9,007 Words DOC/PDF Format Instant Download UPN62869

  • To carry out a project on Role Of Material Coding And Classification In Store Management, follow these effective methods: This study is concerned with the role of material coding and classification in the store management with particular reference to Nigerian bottling company plc (PHC) The researcher study point out the problems and development of coding and classification in the study. The introduction part gives a…

    55 Pages 1 - 5 Chapters 10,949 Words DOC/PDF Format Instant Download UPN62867

  • How to write the “Record Management Of Archival Material” Project

    To start a project on Record Management Of Archival Material, follow these guidelines: This work is aimed at identifying the records management of Archival materials. The purpose of this work is designed to identify the various records management of Archival materials in the management of the Imo State Archives Owerri and to find out the causes of records deterioration and its solu…

    57 Pages 1 - 5 Chapters 6,100 Words DOC/PDF Format Instant Download UPN63447

  • Techniques for writing the “Production Of Plant Mirror Using Local Raw Material” Project

    To develop a project on Production Of Plant Mirror Using Local Raw Material, follow these approaches: This project “production of plane mirror using local raw material” is meant to study the possibility of producing plane mirror using sand rich in silica as its major local raw material. Plane mirror is produced by casting one side of a sheet glass. Presently in Nigeria, sheet glass is not used ea…

    69 Pages 1 - 6 Chapters 9,600 Words DOC/PDF Format Instant Download UPN62908

  • Writing strategies for the “Production Of Emulsion Paint With The Available Material” Project

    INTRODUCTION Until recently, paint production was regarded as art, and use was made of it principally for decorative purposes. The production then was by trial and error with no standard principle and little or no regard to the quality of the final product. With the application of science in the production of paint, product of high quality is now possible. This time, not only to give appearance but more importantly for surface protecti […]

    47 Pages 1 - 5 Chapters 5,529 Words DOC/PDF Format Instant Download UPN62898

  • To undertake a project on Production of Alkali Using Local Raw Material (palm inforescence), follow these effective ways: The project aims to develop a flow process to obtain the optimum temperature and time necessary for the maximum recovery of alkali present in palm inflorescence. On this ground, a preliminary experiment was performed. During this process, both male and female palm inflorescence were compared for …

    85 Pages 1 - 8 Chapters 8,424 Words DOC/PDF Format Instant Download UPN62885

Live Chat