Optimisation Of A Thermal Power Plant Using Heat Recovery

A Case Study At National Water And Electricity Company, Gambia

Overview

ABSTRACT

Thermal power plants present a problem of significant water consumption, carbon dioxide emissions, and environmental pollution. Several techniques have been developed to utilize flue gas, which can help solve these problems. Among these, the ones focusing on energy extraction beyond the dew point of the moisture present within the flue gas are quite attractive. In this study, a novel waste heat recovery system (WHRS) composed of an organic Rankine cycle (ORC) and cooling cycles using singular working fluid accompanied by phase change was proposed and optimized for maximum power output. Furthermore, WHRS configurations were analyzed for fixed water yield and fixed ambient temperature, covering possible trade-off scenarios between power loss and the number of stages as per desired yields of water recovery at ambient temperatures in a practical range. For a 600 MW power plant with 16% water vapor volume in flue gas at 150 C, the WHRS can produce 4–6 MWe while recovering 50% water by cooling the flue gas to 40 C at an ambient temperature of 20 C. Pragmatic results and design flexibility, while utilizing single working fluid, makes this proposed system a desirable candidate for practical application.

Keywords: waste heat recovery; thermal power plant; flue gas; optimization of power plant

 

TABLE OF CONTENTS

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENT

CHAPTER ONE

1.0      INTRODUCTION

1.1      BACKGROUND OF THE PROJECT

1.2      PROBLEM STATEMENT

1.3      AIM AND OBJECTIVES OF THE PROJECT

1.4      SIGNIFICANCE OF THE PROJECT

CHAPTER TWO

2.0      LITERATURE REVIEW

2.1      REVIEW OF THE STUDY

2.2      DISCOVERY OF THERMAL POWER PLANT

2.3      REVIEW OF RELATED STUDIES

CHAPTER THREE

  • METHOD

3.1            THERMAL DESIGN DEMAND
3.2            HRSG TEMPERATURE PROFILE, PINCH POINT AND APPROACH POINT
3.3            NECESSITY OF USING FINNED TUBES
3.4            THERMAL DESIGN SIMULATION OF THE HRSG SECTIONS

3.5            CONSTRAINTS IN THE THERMAL DESIGN OF HRSGS

3.6            CONSTRAINTS

CHAPTER FOUR

4.0      RESULT

4.1      INPUT DATA

4.2      HRSG OPTIMIZATION

CHAPTER FIVE

5.0      CONCLUSION AND RECOMMENDATION

5.1      CONCLUSION

5.2      RECOMMENDATION

REFERENCES

CHAPTER ONE

1.0                                                             INTRODUCTION

1.1                                               BACKGROUND OF THE STUDY

Power plants that utilize fossil fuels, such as coal, pose fuel consumption problems, ultimately resulting in higher CO2 emissions, significant water consumption and hazardous gas emissions. Utilization of waste heat recovery from the flue gas of power plants leads to its condensation and can be a simultaneous solution for the problems mentioned above.

Many studies are being conducted to find ways to utilize flue gas to reduce carbon footprints; these include employing it in the synthesis of methane and ammonia (Castellani et al., 2018), as well as investigations focusing on waste heat recovery and utilization. Some studies focus on the reuse of exhaust gases for co-generation (García et al., 2019) and the use of this energy for pre-drying in coal power plants, which increases the thermal efficiency of the system by approximately 2% (Liu et al., 2016).

Currently, fossil-fuel-based power plants consume vast quantities of water for heat rejection, fuel preparation, power augmentation, emission control, and cycle makeup purposes. At the same time, global water resources are becoming more difficult to procure as water consumption exceeds renewal (Liu et al., 2016). Cooling systems are the most water-intensive portion of the thermoelectric generation process, presenting significant opportunities to reduce withdrawal and consumptive use of fresh water. Reuse of impaired water for cooling can reduce freshwater withdrawal and decrease water contamination as well as withdrawal-related impacts on aquatic life and the environment (Zhang et al., 2017). With the increasing trend of waste heat recovery technologies for fossil-fueled power plants, the need for water recovery from flue gas is also being seriously considered. There is a need to reduce the amount of fresh water needed for cooling purposes to enable power plant operation in more arid regions (Zhang et al., 2017).

The objective of this study is to optimize a waste heat recovery system, comprised of an organic Rankine cycle (ORC), for power generation, with the integration of pumped heat pipe cooling and vapor compression cycle cooling, utilizing a single working fluid to perform heat extraction for power output and water recovery. Also, the characteristics of the proposed system for different yields of water and ambient temperature conditions were investigated. Condensed water and flue gas should be further treated for proper utilization as previously mentioned but are not covered in the context of this study.

1.2                                                     PROBLEM STATEMENT

Coal is a very important fossil fuel. It is abundant and widely distributed in geography, but the coal utilization is related to environmental issues. In Gambia, coal-fired power is one of the means of power production sources. As a result of this, it is important therefore, better energy efficiency in coal-fired power plant is demanded. Due to the more and more stringent requirements of energy conservation and emissions reduction, there is a growing concern over the efficiency increase of coal-fired power plants. The largest heat loss in a boiler is in the exhaust flue gas, which greatly affects the thermal efficiency. It is widely accepted that 1% of the coal can be saved if the flue gas temperature is reduced by 12~15℃ [2]. One of the methods of achieving this is by heat recovery method.

1.3                                                    AIM AND OBJECTIVES OF THE STUDY

The main aim of this work is to carry out a study on a thermal power plant optimization using heat recovery in national water and electricity company, Gambia. The objectives of the study are:

  1. To improve efficiency of the thermal power plant.
  2. To provide a means of solving environmental issues of thermal power plant.
  • To develop a model for the system analysis.

1.4                                                    SIGNIFICANCE OF THE STUDY

Thermal power plant optimization therefore is important for power plants to improve its power generation capacity drastically by reducing the failure rate. This study will help the system by decreasing the shutdown period of the plant and an increase in the system availability as well as the power of the system.

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Optimisation Of A Thermal Power Plant Using Heat Recovery, and acknowledges the contributions of scholars who have previously conducted similar research [REV66165] …

Document Information

    • Format: DOC/PDF
    • Title: Optimisation Of A Thermal Power Plant Using Heat Recovery: A Case Study At National Water And Electricity Company, Gambia

YOU MAY LOVE THESE (Recommended)

  • To start a project on Use Of Manpower Audit For Efficient Man Power Planning, follow these guidelines: The purpose of this research is to investigate on the use of manpower audit for efficient manpower planning in Enugu State Broadcasting Service. In carrying out the research, the researcher used such instrument as questionnaires, interviews and published work to obtain all the relevant data requi…

    89 Pages 1 - 5 Chapters 10,155 Words DOC/PDF Format Instant Download UPN62714

  • Techniques for writing the “Study Of Impact Of Frequency Deviation On Power System” Project

    To develop a project on Study Of Impact Of Frequency Deviation On Power System, follow these approaches: The operation and the development of power system networks introduce new types of stability problems.  The effect of the power generation and consumption on the frequency of the power system can be described as a demand/generation imbalance resulting from a sudden increase/decrease in the demand …

    62 Pages 1 - 5 Chapters 11,700 Words DOC/PDF Format Instant Download UPN65119

  • To undertake a project on Role Of Marketing Research In Enhancing Customer Service Level In The Power Industry, follow these effective ways: Marketing research in now giving position in the solving or organisation problems, both private and public owned organisations. The importance of marketing reach to organisation cannot be over emphasised. Organisation as an open system cannot operate in isolation, they must react to environment (…

    42 Pages 1 - 5 Chapters 4,755 Words DOC/PDF Format Instant Download UPN64279

  • Steps for writing the “Production Of Plant Mirror Using Local Raw Material” Project

    To write a project on Production Of Plant Mirror Using Local Raw Material, follow these structure: This project “production of plane mirror using local raw material” is meant to study the possibility of producing plane mirror using sand rich in silica as its major local raw material. Plane mirror is produced by casting one side of a sheet glass. Presently in Nigeria, sheet glass is not used ea…

    69 Pages 1 - 6 Chapters 9,600 Words DOC/PDF Format Instant Download UPN62908

  • To carry out a project on Problems Of Manpower Development In Government Parastatals, follow these effective methods: The focus of this research work is on the problem of manpower development in government parastatals with special reference to Enugu State Marketing Company which is the case study. The researchers presents the introductory part of the write-up which dealt with the historical background of Enugu S…

    76 Pages 1 - 5 Chapters 9,260 Words DOC/PDF Format Instant Download UPN62197

  • To start a project on Problems Of Acquisition And Replacement Of Plant And Equipment In A Manufacturing Industry, follow these guidelines: This research is a study of the problems of acquisition and replacement of plant and equipment in a manufacturing industry. It is aimed at examining the activities involved in the production process with a view to using it in determining whether or not resources were fully utilized. It is also ai…

    94 Pages 1 - 5 Chapters 11,875 Words DOC/PDF Format Instant Download UPN62194

  • Techniques for writing the “Problems Associated With Loan Recovery In Commercial Banks” Project

    To develop a project on Problems Associated With Loan Recovery In Commercial Banks, follow these approaches: Chapter one portals the problems associated with the Nigeria commercial banks why serves as the introduction of the problems associated with loan recovery and it also gives the historical development of commercial banks in Nigeria. Chapter two, lays emphasis on the loan, origin and deification an…

    31 Pages 1 - 5 Chapters 4,587 Words DOC/PDF Format Instant Download UPN64297

  • To undertake a project on Power Supply And The Performance Of Small And Medium Scale Industries, follow these effective ways: This research work centers on the power supply and the performance of small and medium scale industries in Nigeria from 1986 – 2010. carrying out this study, secondary data were collected and empirical analysis was made to achieve these objectives, multiple regression were used in anglicizing the…

    66 Pages 1 - 5 Chapters 6,988 Words DOC/PDF Format Instant Download UPN63880

  • Steps for writing the “Power Amplifier” Project

    INTRODUCTION Power amplifier is an electronic device, which is used to increase sound energy. In other words, the final stage which must driven a given load e.g mechanical indicator, a loudspeaker cathode roy tade, magnetic deflection coil, a transmitting accrual of a communication network. Power amplifier is also used in regulation power supplies, chopper amplifier, motor controller etc. In general the load will by its nature, demand […]

    38 Pages 1 - 5 Chapters 3,996 Words DOC/PDF Format Instant Download UPN63998

  • To write a project on Loan Granting And Its Recovery Problems On Commercial Banks, follow these structure: This research work was undertaken to assess the Loan granting and its recovery problems on Commercial Banks. The research was intended to achieve the following objectives: To find out the several problems facing loan recovery, the effects of loan default on commercial banks and the measures that …

    59 Pages 1 - 5 Chapters 6,395 Words DOC/PDF Format Instant Download UPN64307

Live Chat