Design And Construction Of An Automatic Changeover Switch With Phase Monitoring Device

Overview

ABSTRACT

This project work is on the design and construction of automatic changeover switch. It provides a means of switching from one phase of AC mains to another in the case of failure in the existing phase; it also changeover to generator if there is failure in all the three phases of the AC mains. The circuit also senses the restoration of any or all the three phases of the mains and changeover without any notice of power outage. This project has been improved on the existing types of electromechanical device that has being in use over the years.

The aim of this work is to introduce an automatic solution to overcome power fluctuation/phase interruption by selecting next most healthy available phase to feed the equipment without any notice of power outage which is achieved by the use of operational amplifier, timing circuit and high current relay switches and it is powered by 12V dc power supply Hence this has been achieved by the use of operational amplifier, timing circuit and high current relay switches and it is powered by 12V dc power supply.

CHAPTER ONE

1.0                                                        INTRODUCTION

1.1                                         BACKGROUND OF THE PROJECT

The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage.

Power instability or outage in general does not promote development in the public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance for instance, surgery operation in hospitals, transfer of money between banks and lots more. Power instability and outage in developing countries (Nigeria) creates a need for alternative sources of power to backup the mains supply.

Automatic changeover switches find a wide application scope wherever the reliability of electrical supply from the utilities is low and it is used in lighting/motor circuits wherever continuity of supply is necessary, for switching to an alternative source from main supply and vice versa.

The Change Over Switch is a device used to switch off a power supply and subsequently switch on another power supply. Basically it is aimed at switching on a more convenient power supply to the load. Since it switches on power to the load, precautions has to be taken while choosing the type of Change Over Switch, while selecting the appropriate size, the control of arcing has to be put into consideration.

A good switch should be the one whose contact is made in such a way as to limit the arc formation by having no contact-bounce and by having contacts made of good conductive, corrosion resistance and wear resistance materials.

A good change over switch must have adequate insulation and must be so constructed and located as not to constitute a potential hazard.

A good change over switch should also have tight contact points so as to limit or eliminate the possibility of partial contact at the contact point. The partial contact leads to over-heating of the components and may lead to fire outbreak in the entire room.

1.2                                                 AIMS AND OBJECTIVES

Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has lead to heavy capital investment in a bid to suppress power failure and ensure regular power supply for the industry, hospitals, schools and homes. The problem of power failure can be checkmated with the use of stand-by generating set.

An Engineering Author, “Tony Rudkin” said in his book titled “Upgraded Signal Source with Improved Performance and Reliability” that the cost and depredation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.

If some of these big firm do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospital, undergoing a surgical operation and power supply suddenly go off, the patient might loose his or her life due to the power outage.

Furthermore, if the president of the country is making nationwide broadcast and all of a sudden power went off in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must pay for it.

In his book, Tony Rudkin also said that the depredation caused by such reduce efficiency of the organization and leads to a great deal of frustration.

Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured and installed in our homes, hospitals and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.

In view of these considerations, this project is aimed at designing and constructing a workable automatic change over switch with a phase failure detecting circuit also known as “Automatic Mains Failure” which switches on the head from power Holding Company (PHC) to a generator when power fails and from generator to PHC when power comes back.

1.3                                         SIGNIFICANCE OF THE PROJECT

The automatic change over switch, the switch aimed at achieving the following automatic actions;

  • To change power over to generator
  • To change back to PHC
  • To change the generator.

The automatic change over unit can be operated in single or three phase system. The automatic change over switch has the following advantages;

It minimizes damages to lives/equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.

It reduces its change over timing to the minimum due to its fast response to power outage.

It maintains high quality of service through its fast and prompt response.

Moreover, the size and captivity of the unit will depend upon the load for which it will be used. The unit is also portable, easy, convenient and safe to install.

1.5                                     STATEMENT OF THE PROBLEMS

In every home, office or industries, automatic power changeover  plays a vital role, that is, It provides a means of switching from utility AC mains to generator in the case of power failure; This project has been improved on the existing types of electromechanical device that has being in use over the years.

In the course of designing this project, different kinds of problem was notice such as:

  • Difficulty in troubleshooting with circuit without the circuit diagram
  • Difficulty in connecting the output without short-circuiting, until a multiplexing circuit was gotten.
  • Difficult in wiring because of the strong wiring the project required..

1.6                              SCOPE AND LIMITATION OF THE STUDY

This work covers only a three phase automatic changeover which can only be used for providing a means of switching from one phase of AC mains to another in the case of failure in public utility, which can also be used to switch from public utility to generator when there is total failure in the three phase of public utility.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design And Construction Of An Automatic Changeover Switch With Phase Monitoring Device, and acknowledges the contributions of scholars who have previously conducted similar research [REV65551] …

Document Information

    • Format: DOC/PDF
    • Title: Design And Construction Of An Automatic Changeover Switch With Phase Monitoring Device:

YOU MAY LOVE THESE (Recommended)

  • To start a project on Leasing As A Major Financing Device For Small Scale Industries, follow these guidelines: Small-scale enterprises like Hapel Nigeria limited generally suffer from lack of adequate finance. The introduction of the structural adjustment programme compounded the problem such that the enterprise could hardly finance the fixed capital requirements. In this circumstance, small-scale enterpr…

    69 Pages 1 - 5 Chapters 8,993 Words DOC/PDF Format Instant Download UPN61932

  • Techniques for writing the “Home Control Switch Automation Using GSM Communication” Project

    To develop a project on Home Control Switch Automation Using GSM Communication, follow these approaches: The advantage of cellular communication like GSM technology is a potential solution for such remote controlling activities. GSM-SMS technology can be used to control household appliances from remote places. Remotely, the system allows the home owner to monitor and control his house appliances via…

    62 Pages 1 - 5 Chapters 7,123 Words DOC/PDF Format Instant Download UPN63940

  • Writing strategies for the “Design And Simulation Of An Electric Device With Audio Unit” Project

    To undertake a project on Design And Simulation Of An Electric Device With Audio Unit, follow these effective ways: This work deals extensively with the design and construction of an electrodice display (EOD) with audio unit. The device displays the value of a ludo dice in numerical form and also produces sound as it displays the number. The device works with principle of chance employed by ludo game players. …

    59 Pages 1 - 7 Chapters 7,832 Words DOC/PDF Format Instant Download UPN63392

  • INTRODUCTIONAttacks on computer by outside intruder are more publicized but the onesperpetrated by insiders are very common and often more damaging. Insidersrepresent the greatest threat to computer security because they understand theirorganization’s business and how their computer systems work. They have boththe confidentiality and access to perform these attacks. An inside attack willhave a higher probability of successfully breakin […]

    54 Pages 1 - 5 Chapters 1,549 Words DOC/PDF Format Instant Download UPN63032

  • To write a project on Design And Implementation Of Computerized Economic Growth Monitoring System, follow these structure: Federal Ministry of Finance has always monitoring how economic growth is moving in this Nation. After the granting of internal autonomy to regions in 1946, there have been subsequent fiscal commission, military decrees Actes of Parliaments that reviewed both dreamed earning structure for Governme…

    45 Pages 1 - 7 Chapters 5,075 Words DOC/PDF Format Instant Download UPN63350

  • To carry out a project on Design And Implementation Of A Online Birth Rate Monitoring Information System, follow these effective methods: This project is specially put together with the aim of monitoring infant and matality rate through the use of information system, it is believed that at the end of this work, its users would be able to know the importance involved in monitoring birth rate on every born child that is being born in…

    37 Pages 1 - 7 Chapters 4,597 Words DOC/PDF Format Instant Download UPN63214

  • To start a project on Design And Implementation Of A Computer Case Filling System Of Drug Monitoring Agent, follow these guidelines: The manual approach used in the regulation of the investigation been carried out by the National Drug investigations is very devious and dress full. This research work investigated into the problems encountered due to the debilitation of hard dugs admitted into the country as well as in the socie…

    60 Pages 1 - 7 Chapters 5,374 Words DOC/PDF Format Instant Download UPN63118

  • To develop a project on Design And Implementation Of A Computer Based Quality Assurance Monitoring System, follow these approaches: This study is based on the computerization of a quality assurance monitoring system of a manufacturing industry. It entails sourcing from all parts of the company on how they operate especially in the quality assurance department. This project is narrowed to the expected module. It is not the in…

    46 Pages 1 - 7 Chapters 4,429 Words DOC/PDF Format Instant Download UPN63110

  • To undertake a project on Design And Implementation Of A Case Filling System For A Drug Monitoring Agency, follow these effective ways: The world over, it is indisputable that the introduction of computer technology in different facets of life, has virtually transformed and entranced information processing, which is very vital in any organization or parastatals of government. Not only as a means of information processing, has the…

    133 Pages 1 - 5 Chapters 15,232 Words DOC/PDF Format Instant Download UPN63101

  • To write a project on Design And Development Of Home Intrusion And Burglary Detective Monitoring System, follow these structure: The main objective of this project was to ensure a proper security to building against theft or intruder. An intrusion detection systems are an integral part of most physical security systems. This device is widely used to isolate and protect public and private places such as airports, military b…

    61 Pages 1 - 5 Chapters 8,427 Words DOC/PDF Format Instant Download UPN66410

Live Chat