This project presents design and construction of power failure alarm with auto generator starting device. In modern society, it is impossible to imagine life without electricity. Modern equipment requires a continuous supply of electricity. Not only industry, but also in the household. Take the case of an ordinary refrigerator. If you experience a power off situation, your food will be spoilt. But much more important, what if the power failure “spoils” your business. For example, uninterrupted power supply is needed for your server, which manages your accounting programmed or provides uninterrupted operation of your website.

Of course, in most critical applications, uninterruptible power supplies (UPS) are used, but this is not always the case. Also, these devices cannot provide continuous operation in the event of remote power off. Often you need to take other action according to the situation.

For us to be notified when the power off condition has occurred a power failure signal device is used. This system indicates when there is power failure through alarm indication. As soon as the system experiences power failure you will receive a signal from an alarm and at the same time automatically power an auto-powering generator through a high current relay.

Power Outage signal notifies you by alarm when your electrical equipment suffers a power outage. If you have important equipment running and want to know if there has been a power cut while you’re not around, this app can help. From Freezers to Fish Tanks and all things electrical, Power Outage Alarm can provide you with additional peace of mind.

TABLE OF CONTENTS

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENT

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE PROJECT

1.2 OBJECTIVE OF THE PROJECT

1.3 SCOPE OF THE PROJECT

1.4 SIGNIFICANCE OF THE PROJECT

1.5 LIMITATION OF THE PROJECT

1.6 ADVANTAGES OF THE PROJECT

1.7 APPLICATION OF THE PROJECT

1.8 PROJECT ORGANISATION

CHAPTER TWO

2.0 LITERATURE REVIEW

2.1 REVIEW OF ELECTRIC POWER SUPPLY

2.2 TYPES OF POWER FAILURE

2.3 PROTECTING THE POWER SYSTEM FROM FAILURE

2.4 RESTORING POWER AFTER A WIDE-AREA OUTAGE

2.5 POWER FAILURE INEVITABILITY AND ELECTRIC SUSTAINABILITY

2.6 MITIGATION OF POWER OUTAGE FREQUENCY

CHAPTER THREE

3.0 METHODOLOGY

3.1 INTRODUCTION

3.2 BLOCK DIAGRAM OF THE SYSTEM

3.3 SYSTEM CIRCUIT DIAGRAM

3.4 SYSTEM OPERATION

3.5 CIRCUIT DESCRIPTION

CHAPTER FOUR

RESULT ANALYSIS

4.0 CONSTRUCTION PROCEDURE AND TESTING

4.1 CASING AND PACKAGING

4.2 ASSEMBLING OF SECTIONS

4.3 TESTING OF SYSTEM OPERATION

CHAPTER FIVE

5.1 CONCLUSION

5.2 RECOMMENDATION

5.3 REFERENCES

CHAPTERONE

1.0 INTRODUCTION

1.1 BACKGROUND OF THE PROJECT

In modern society, it is impossible to imagine life without electricity. Modern equipment requires a continuous supply of electricity. Not only industry, but also in the household. Take the case of an ordinary refrigerator. If you experience a power off situation, your food will be spoilt. But much more important, what if the power failure “spoils” your business. For example, uninterrupted power supply is needed for your server, which manages your accounting programme or provides uninterrupted operation of your website.

Of course, in most critical applications, uninterruptible power supplies (UPS) are used, but this is not always the case. Also, these devices cannot provide continuous operation in the event of remote power off. Often you need to take other action according to the situation. But how do you know that the remote site has experienced a power off condition?

For us to be notified when the power off condition has occurred a power failure signal device is used. This system indicates when there is power failure through alarm indication. As soon as the system experiences power failure you will receive a signal from an alarm.

Power Outage signal notifies you by alarm when your electrical equipment suffers a power outage. If you have important equipment running and want to know if there has been a power cut while you’re not around, this app can help. From Freezers to Fish Tanks and all things electrical, Power Outage Alarm can provide you with additional peace of mind.

Power failure may be caused by various factors: an overload on the power plant, a thunderstorm, cable breakage during excavations. Whatever the reason you will be notified as soon as the power failure occurred in your remote area and you can act accordingly. This system also will give a notification when the power was restored.

Power Outage Alarm works happily in the background on your Android device and will keep monitoring even when your device is asleep and the screen is off.

1.1 AIMS AND OBJECTIVES

Due to inconsistent supply of power, there is a growing need for an indication when there is power failure. This has lead to destruction of our electrical appliances in industry, hospitals, schools and homes. The problem of power failure can be checkmated with the use of stand-by generating set after an indication.

Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured and installed in our homes, hospitals and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.

In view of these considerations, this project is aimed at designing and constructing a workable power failure alarm with a auto-generator starting device which switches on the generator when power fails.

 

1.2 SIGNIFICANCE OF THE PROJECT

A failure in the power supply to some people causes only a irritant, they may have to reset a clock, but to other people especially business, they can and do cause thousands of pounds of damage. This damage may be in the form of lost food in a fridge or freezer, amounting to hundreds of naira of lost stock, it may be chemicals, medicines, and electronics.

A power cut may have cut the heater off in the greenhouse, a fan off in a computer room, it may have caused a computer to fail, there are hundreds of reasons that you need to know if there is or has been a power failure. This device is designed to inform you when the power has failed.

1.3 LIMITATION OF THE PROJECT

The power failure alarm with generator auto starting device, this switch is limited at performing three automatic actions;

To automatically start a generator

To indicate when there is power supply

To blow alarm when there is power failure.

1.4 ADVANTAGES OF THE PROJECT

The power failure alarm unit can be operated in single or three phase system. And it has the following advantages;

It minimizes damages to lives/equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.

It reduces its change over timing to the minimum due to its fast response to power outage.

It maintains high quality of service through its fast and prompt response.

Moreover, the size and captivity of the unit will depend upon the load for which it will be used. The unit is also portable, easy, convenient and safe to install.

1.5 CONSEQUENCES OF A POWER FAILURE

No lights in the house

Loss of refrigeration – food spoils

No heat or air conditioning

No flushing toilets or running water

Can’t cook on electric range or in microwave oven

1.6 APPLICATION OF POWER FAILURE SIGNAL

Why someone would need a power failure signal is to notify them that the electricity is out, you may wonder. After all, isn’t it pretty obvious when there is a power outage — the lights go out, the TV doesn’t work, and all other appliances. In most instances, it is pretty obvious when there’s a power outage, unless:

You aren’t home when it occurs, or

You are asleep, or

Only one circuit is affected (inevitably it’s the refrigerator!)

For those kinds of power outages, or for blackouts that happen at your vacant vacation house, a power failure alarm is a sure-fire device to receive immediate notifications. And in the summer when there’s an increase in power outages caused by severe weather, a power failure alarm is a good investment to protect your home and family.

1.7 SCOPE OF THE PROJECT

This project is a power supply monitoring device that will trigger a buzzer when the mains supply cuts off. At the same time, the light emitting diode will be turned ON. This device is helpful to inform the loss of power supply to some critical installation such as a pump in a fish tank. Once the buzzer sound, one will know that there is a loss of power supply and actions need to be taken to rectify the situation by providing alternative power supply or relocating the installation.

1.8 PROJECT WORK ORGANISATION

The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:

Chapter one of this work is on the introduction to the power failure alarm. In this chapter, the background, significance, objective limitation and problem of power failure alarm were discussed.

Chapter two is on literature review of power failure alarm. In this chapter, all the literature pertaining to this work was reviewed.

Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.

Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.

Chapter five is on conclusion, recommendation and references.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Design And Construction Of Power Failure Alarm With Auto Generator Starting Device, and acknowledges the contributions of scholars who have previously conducted similar research [REV64750] …

Document Information

    • Format: DOC/PDF
    • Title: Design And Construction Of Power Failure Alarm With Auto Generator Starting Device:

YOU MAY LOVE THESE (Recommended)

  • To start a project on Use Of Manpower Audit For Efficient Man Power Planning, follow these guidelines: The purpose of this research is to investigate on the use of manpower audit for efficient manpower planning in Enugu State Broadcasting Service. In carrying out the research, the researcher used such instrument as questionnaires, interviews and published work to obtain all the relevant data requi…

    89 Pages 1 - 5 Chapters 10,155 Words DOC/PDF Format Instant Download UPN62714

  • To develop a project on Survey Of The High Rate Of Failure In Shorthand In The Department Of Secretarial Studies, follow these approaches: This dissertation is concerned with the survey of the high rate of failures in shorthand. This enables the researcher to have a broad and elaborate knowledge of the problem faced by shorthand students and how they can be tackled. Shorthand, formally known as phonograhy is an art; a time saving sy…

    61 Pages 1 - 5 Chapters 7,687 Words DOC/PDF Format Instant Download UPN62951

  • Writing strategies for the “Study Of Impact Of Frequency Deviation On Power System” Project

    To undertake a project on Study Of Impact Of Frequency Deviation On Power System, follow these effective ways: The operation and the development of power system networks introduce new types of stability problems.  The effect of the power generation and consumption on the frequency of the power system can be described as a demand/generation imbalance resulting from a sudden increase/decrease in the demand …

    62 Pages 1 - 5 Chapters 11,700 Words DOC/PDF Format Instant Download UPN65119

  • To write a project on Strategies For Reducing Mass Failure Of Students In Chemistry In Secondary Schools, follow these structure: This study was carried out to examine the strategies for reducing mass failure of students in chemistry in secondary schools in Makurdi Metropolis in Benue State. Specifically, it sought to identify school factors contributing to mass failures, examine teachers’ roles in student failures, explore…

    66 Pages 1 - 5 Chapters 15,669 Words DOC/PDF Format Instant Download UPN79029

  • To carry out a project on Role Of Marketing Research In Enhancing Customer Service Level In The Power Industry, follow these effective methods: Marketing research in now giving position in the solving or organisation problems, both private and public owned organisations. The importance of marketing reach to organisation cannot be over emphasised. Organisation as an open system cannot operate in isolation, they must react to environment (…

    42 Pages 1 - 5 Chapters 4,755 Words DOC/PDF Format Instant Download UPN64279

  • To start a project on Role And Importance Of Central Bank In The Prevention Of Bank Failure, follow these guidelines: This study, which is, captioned the Role and Importance of the Central Bank in the Prevention of Bank Failure in Nigeria has revealed the types, causes effects recognition and prevention of bank failure in Nigeria. Some of the findings indicated that banking failure was mainly as a result of poor…

    104 Pages 1 - 5 Chapters 10,711 Words DOC/PDF Format Instant Download UPN62204

  • Techniques for writing the “Problems Of Manpower Development In Government Parastatals” Project

    To develop a project on Problems Of Manpower Development In Government Parastatals, follow these approaches: The focus of this research work is on the problem of manpower development in government parastatals with special reference to Enugu State Marketing Company which is the case study. The researchers presents the introductory part of the write-up which dealt with the historical background of Enugu S…

    76 Pages 1 - 5 Chapters 9,260 Words DOC/PDF Format Instant Download UPN62197

  • To undertake a project on Problem And Difficulties Being Face By Banks As A Result Of Bank Failure With Specific Reference To Banks, follow these effective ways: The aim of writing this project is to explain the problem and difficulties being face by banks as a result of bank failure with specific reference to banks. To achieve this aim the research work has been classified under five chapters. The first chapter deals with the introduction statement of pr…

    38 Pages 1 - 5 Chapters 4,551 Words DOC/PDF Format Instant Download UPN62190

  • To write a project on Power Supply And The Performance Of Small And Medium Scale Industries, follow these structure: This research work centers on the power supply and the performance of small and medium scale industries in Nigeria from 1986 – 2010. carrying out this study, secondary data were collected and empirical analysis was made to achieve these objectives, multiple regression were used in anglicizing the…

    66 Pages 1 - 5 Chapters 6,988 Words DOC/PDF Format Instant Download UPN63880

  • Guide for writing the “Power Amplifier” Project

    INTRODUCTION Power amplifier is an electronic device, which is used to increase sound energy. In other words, the final stage which must driven a given load e.g mechanical indicator, a loudspeaker cathode roy tade, magnetic deflection coil, a transmitting accrual of a communication network. Power amplifier is also used in regulation power supplies, chopper amplifier, motor controller etc. In general the load will by its nature, demand […]

    38 Pages 1 - 5 Chapters 3,996 Words DOC/PDF Format Instant Download UPN63998

Live Chat