Pump Capacity Determination For Two-Phase Vertical Fluid Flow

Chapter One

Introduction

1.1 Background of Study

In the production system, Pressure drop has been a major issue in the field. These pressure drops could be experienced as a result of valves and fittings

installed, due to friction along pipe sections or in lifting fluid up to a certain level.

As these pressure drops are identified, and the economic flow rate of a reservoir fluid is known, pumps may be employed to reduce the effect of pressure drop and maintain a given fluid flow rate for good economic recovery. These pump applications are usually analysed to determine an optimum Hydraulic pump requirement for a given fluid system and pipe diameter. It can form one of the basic aspect to be considered during well completion in selecting production tubing diameter.

In general, a pump is a device used to transport liquids, gases, and slurries. However,the term pump is usually used to refer to liquid handling equipment. The purpose of the pump is to provide a certain pressure at certain flowrate of a process stream. The pressure requirement is dictated by the process andpiping involved, while the flow rate is controlled by the required capacity in thedownhole units.

At least one out of every 10 barrels of oillifted in the world’s oil and gas operations are produced using an ElectricSubmersible Pump (ESP). Typical installationsproduce liquids in the 2,000 to 20,000 bpd range,making the ESP an effective and economical meansof lifting large volumes of fluids from great depthsunder a variety of well conditions.

There are several types of pumps used for liquid handling. However, these can bedivided into two general forms: positive displacement pumps (including reciprocatingpiston pump and the rotary gear pump), and centrifugal pumps. The selection of thepump type depends on many factor including the flow rate, the pressure, the nature ofthe liquid, power supply, and operating type (continuous or intermittent).

The power requirement for a mechanical system, like pumps and compressors, isgiven by the general mechanical balance equation:

P = -mWs = m 1.1

All terms in this equation take their normal meaning with m being the mass flow rate,and α a coefficient used to take into account the velocity profile inside the pipe (forlaminar α = 0.5, while for turbulent α = 1). The required work (or power) given by Pis the total work that needs to be delivered to the fluid. This work will be drawn froma motor (operated with electricity or engines). The conversion between the motor andpump power is not complete and an efficiency is defined to describe the powerconversion. The efficiency is given by:

The input power can be measured from the source. For example, if the pump is

operated with electricity, the input power will be I×V (current times voltage). Theoutlet power can be determined using Equation (1.1).

Static head (Δzterm): the height to which the fluid will be pumped.

Pressure head ( term): the pressure to which the fluid will be delivered (ina pressurized vessel for example). The pressure units must be converted to lengthunits using relation.

System or dynamic head (F term): the energy lost due to friction in pipes, valves,fittings, etc.

 

1.2 Statement of the Problem

It is important to accurately predict the pressure drop accross a production system. This has been a difficult task in the oil and gas industry as the production system in real life is not homogenous (single phase) as assumed in most theories. The reason for this is that the two-phase flow is complex and difficult to analyze. Ideally, gas moves at a much higher velocity than the liquid. As a result, the down hole flowing pressure of the liquid-gas mixture is greater than the corresponding pressure corrected for down hole temperature and pressure and this could be calculated from the produced gas-liquid ratio.

This pressure drop in a flowing (production) system could be identified using different existing correlations. Some of these correlations are empirical, mechanistic or numerical. Hagedorn and Brown is the most widely used correlation for vertical wells (Schoham, 2006). In planning well completion the tubing diameter that will give less pressure drop hence much liquid production can be selected by the use of multiphase correlation.

It is also very necessary to plan for pumps in tubing size selection should need arise on future production for pumping of the reservoir fluid to optimize production.

1.3 Objective of the Study

Determine the Hydraulic Horse Power Requirement needed to maintain production of reservoir fluid within economic limit.

The above objective can be achieved by using two-phase pressure drop correlations to determine pressure drop in selected production tubing used in the Niger Delta.

1.4 Scope of the Study

The determination of pressure drop using the selected two-phase correlations using production tubings used most often in the Niger Delta.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Pump Capacity Determination For Two-Phase Vertical Fluid Flow, and acknowledges the contributions of scholars who have previously conducted similar research [REV87617] …

Document Information

    • Format: DOC/PDF
    • Title: Pump Capacity Determination For Two-Phase Vertical Fluid Flow:

YOU MAY LOVE THESE (Recommended)

  • How to write the “Structural Detailing Of Two Storey Building” Project

    INTRODUCTION In other to provide information to contractors in a construction industry for works to be carried out on sites, drawings are produce, which serves as means of communication are used by designers in every engineering specters. For those reason, the works are mostly work of a structural engineer to design a construction of structure for sheltering to be completed, such as road, bridges, railways, dams, buildings and other re […]

    26 Pages 1 - 6 Chapters 3,136 Words DOC/PDF Format Instant Download UPN64251

  • To start a project on Role Of Purchasing In Quality Determination (PQD) In The Manufacturing Industries, follow these guidelines: This study in an investigation on the role of purchasing in quality determination (PQD ) in a manufacturing industries. A total number of two hundred questionnaires were administrered, while four hypothesis were formulated and tested. Finding shows that there is a significant relationship between…

    61 Pages 1 - 5 Chapters 9,013 Words DOC/PDF Format Instant Download UPN62917

  • Techniques for writing the “Role Of Purchasing In Quality Determination” Project

    1.0 INTRODUCTION In any organization, big or small, considers quality as the most important thing that determines the efficiency and effectiveness of its product and services. Quality now becomes the point of view of every purchases (procurement) section of a firm. The meaning of quality by dictionary defines quality as “ fitness, merit, excellence. According to Oyeoku (2005:pg 72) he sees quality as a set of specification, governing s […]

    71 Pages 1 - 5 Chapters 6,564 Words DOC/PDF Format Instant Download UPN62879

  • To develop a project on Role Of Purchasing In Quality Determination And Control In An Organization, follow these approaches: This project work is discussed the role of purchasing in quality determination. Chapter one deals with the introductory part of the project, it also touched the backg0orund of study, statement of problem, objective of study, scope of the study etc. Chapter two discusses the literature review, whi…

    58 Pages 1 - 5 Chapters 5,797 Words DOC/PDF Format Instant Download UPN62877

  • Writing strategies for the “Reinsurance Practices And Underwriting Capacity Of Insurers” Project

    To undertake a project on Reinsurance Practices And Underwriting Capacity Of Insurers, follow these effective ways: This study investigates how the use of reinsurance impacts the underwriting capacity of non-life insurance companies in Nigeria. The quantitative aspect of the research employed a longitudinal descriptive research design, analyzing aggregate industry data from forty-one insurance companies operat…

    46 Pages 1 - 5 Chapters 8,958 Words DOC/PDF Format Instant Download UPN82760

  • Steps for writing the “Refurbishment Of Fluid Flow Demonstration Unit” Project

    To write a project on Refurbishment Of Fluid Flow Demonstration Unit, follow these structure: The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equip…

    50 Pages 1 - 5 Chapters 7,347 Words DOC/PDF Format Instant Download UPN62934

  • To carry out a project on Quality Determination And Control The Contribution Of Purchasing, follow these effective methods: The study was investigated on “Quality Determination and control the contribution of purchasing” A case study of star paper mills limited Aba for the purpose of quick reading and comprehension, the study report been classified into five chapters. The first chapter, take of with introduction which…

    87 Pages 1 - 5 Chapters 11,075 Words DOC/PDF Format Instant Download UPN62846

  • To start a project on Investigation To Ascertain The Causes Of Failure And Present Traffic Capacity Of Highways, follow these guidelines: The essence of this project work is to look into the causes of highway failure and the different types of failure which are presented along the Eliozu – New Airport road in Obio/Akpor L.G.A in River state, taken as a case study. Some factors identify as being responsible for the failure of the ch…

    150 Pages 1 - 5 Chapters 19,320 Words DOC/PDF Format Instant Download UPN62978

  • INTRODUCTION 1.1 Background to the study The water is the most important natural resource especially in the arid or semi-arid zones that face high population growth, scarcity of freshwater, irregularity of rain- fall, excessive land use change and increasing vulnerability to risks such of drought, desertification and pollution. Thus, the availability and the sustainable use of this resource become the core of the local and national str […]

    45 Pages 1 - 5 Chapters 6,562 Words DOC/PDF Format Instant Download UPN64138

  • Techniques for writing the “Improvement Of Bearing Capacity Of Sandy Soil By Grouting” Project

    To develop a project on Improvement Of Bearing Capacity Of Sandy Soil By Grouting, follow these approaches: The construction of structure on weak ground often requires the soil to be improved in order to ensure the safety and the stability of surrounding buildings. The ground improvement in granular soils can be achieved by different methods such as vibro-floatation, compaction piles, and compaction wi…

    30 Pages 1 - 5 Chapters 3,737 Words DOC/PDF Format Instant Download UPN84409

Live Chat