Design And Construction Of A Water Level Control System Using Ultrasonic Sensor

Overview

ABSTRACT

Majority of earth’s surface is covered with water but less than 5% is useful. So water conserving has become a major issue so certain water management steps are to be taken. Measuring and control of water level is an important task from government and residence side more especially when pumping water in overhead tank. Thus, existing management systems has to be updated [1]. In this paper, we investigate the water level control using ultrasonic sensor which detects the amount of water present in the tank and returns the percentage of water present in it. This system has an Arduino, motor pump, LCD display, over-head tank, resource tank, buzzer and an LED. All components are interfaced with the Arduino and works by automation as per uploaded code. Ultrasonic sensor detects the object and measures the distance by following echo principle in this proposed system, water is also considered as object when a sound ray strikes water it results in generation of echo which is detected by the echo part of ultrasonic sensor.

TABLE OF CONTENTS

COVER PAGE

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWELDGEMENT

ABSTRACT

CHAPTER ONE

INTRODUCTION

1.1      BACKGROUND OF THE PROJECT

  • PROBLEM STATEMENT
  • PURPOSE OF THE PROJECT
  • OBJECTIVE OF THE PROJECT
  • SIGNIFICANCE OF THE PROJECT
  • SCOPE OF THE PROJECT
  • LIMITATION OF THE PROJECT
  • APPLICATION OF THE PROJECT
  • PROJECT ORGANISATION

CHAPTER TWO

LITERATURE REVIEW

  • OVERVIEW OF ULTRASONIC SENSOR
  • REVIEW OF THE RELATED WORKS
  • PROPOSED SYSTEM
  • HC-SR04 ULTRASONIC SENSOR
  • HC-SR04 ULTRASONIC SENSOR – WORKING
  • HOW TO USE THE HC-SR04 ULTRASONIC SENSOR

CHAPTER THREE

METHODOLOGY

  • SYSTEM BLOCK DIAGRAM
  • SYSTEM BLOCK DESCRIPTION
  • TOOLS AND INSTRUMENTS
  • CIRCUIT DIAGRAM
  • COMPONENTS LIST
  • ULTRASONIC SENSOR MODULE
  • WORKING OF AUTOMATIC WATER LEVEL CONTROLLER
  • CIRCUIT DIAGRAM AND EXPLANATION
  • ULTRASONIC SENSOR DETECTION
  • SYSTEM ARDUINO PROGRAMMING
  • SYSTEM CODE

CHAPTER FOUR

  • CONSTRUCTION PROCEDURE AND TESTING
  • CONSTRUCTION PROCEDURE AND TESTING
  • CASING AND PACKAGING
  • ASSEMBLING OF SECTIONS
  • PROBLEM ENCOUNTERED
  • RESULTS

CHAPTER FIVE

  • CONCLUSION
  • RECOMMENDATION
  • REFERENCES

CHAPTER ONE

1.0                                                 INTRODUCTION

1.1                                           BACKGROUND OF THE STUDY

In an attempt to mitigate problems such as poor water allocation, inefficient use, and lack of adequate and integrated water management, Automatic Water level controller system is designed to monitor liquid level in an overhead tank or any liquid storage system with an automatic pumping system attached to it to refill the tank once the liquid gets to the lower threshold, while switching OFF the pump once the liquid gets to the higher threshold

The Water Level Controller System is an Electronic Equipment which when electrically connected to the starter of any given pump -set motor will control the level of water thereby controlling the operation of the pump. It Switches ON the Pump-set when Water level drops below pre-set level in Overhead Tank, Switches OFF the Pump-set when Water level in Overhead Tank becomes full ,Switches OFF the Pump-set when Water level is low in tank , and Switches ON the Pump-set when there is sufficient water in the tank.

In this Arduino based automatic water level controlling project we are going to measure the water level by using ultrasonic sensors. Basic principal of ultrasonic distance measurement is based on ECHO. When sound waves are transmitted in environment then they return back to the origin as ECHO after striking on any obstacle. So we have to only calculate its traveling time of both sounds means outgoing time and returning time to origin after striking on any obstacle. And after some calculation we can get a result that is the distance. This concept is used in our water controller project where the water motor pump is automatically turned on when water level in the tank becomes low.

1.2                                                  PROBLEM STATEMENT

This device came to mitigate problems such as poor water allocation, inefficient use, and lack of adequate and integrated water management, Automatic Water level controlling system using ultrasonic sensor is designed to monitor liquid level in an overhead tank or any liquid storage system with an automatic pumping system attached to it to refill the tank once the liquid gets to the lower threshold, while switching OFF the pump once the liquid gets to the higher threshold

1.3                                             OBJECTIVE OF THE PROJECT

The objective this work is constructing a device that will control the flow and pumping of water in the overhead tank.

1.4                                              PURPOSE OF THE PROJECT

The purpose of this device controls, monitors and maintains the water level in the overhead tank and ensures continuous flow of water round the clock eliminating the stress of operating the pump manually thereby saving time, energy , water etc

1.5                                         SIGNIFICANCE OF THE PROJECT

Advantages of automatic water controlling system are as follows:

  • Suitability: These water level controllers are ideally suited for normal water as well as for ultra low conductivity water with less than 1 micro/moh.
  • Easy to Operate: these systems come fitted with sensitivity setting which can be provided externally on a dial or with internal settings.
  • Settings: It is equipped with technology which works on low or high sensitivity settings on the same machine and thereby saves costs of buying and using two different machines.
  • Materials of Construction: this water control system is protected against corrosion.
  • Safety: This system is highly insulated, leakage proof and works without creating any noise.
  • Save roofs
  • Save water
  • Save electricity

1.6                                       LIMITATION OF THE PROJECT

Ultrasonic sensor HC-SR04 used in this work measures distance in range of 2cm-400cm with accuracy of 3mm.

1.7                                                 SCOPE OF THE PROJECT

The Water Level Controller System is an Electronic Equipment which when electrically connected to the starter of any given pump motor will control the operation of the pump depending upon the water level in the Source and Destination Storage Tanks.

It can automatically switch ON and OFF the domestic water pump set depending on the tank water level. You can implement this motor driver circuit at your home or college using less costly components. The main advantage of this water level controller circuit is that it automatically controls the water pump without any user interaction.

1.8                APPLICATIONS AND USES OF THE PROJECT

The uses of a water level controller include the following applications:

  • Can be used in water tanks to control water levels
  • Automatically turn ON/OFF pumps
  • Can be used in factories, commercial complexes, apartments, home,
  • Fuel tank level gauging
  • Oil tank level control
  • High & low-level alarms
  • Pool water level control
  • Life station switches
  • Leachate level control
  • Cooling tower water level control
  • Sewage pump level control
  • Remote monitoring liquid
  • Water level control
  • Pump controller
  • Stream level monitoring
  • Sump pump
  • Tsunami warning and sea level monitoring
  • Process batch control and monitoring
  • Irrigation control

1.9                                        PROJECT WORK ORGANISATION

The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:

Chapter one of this work is on the introduction to this study. In this chapter, the background, aim, purpose, application, significance, objective limitation and problem of this work was discussed.

Chapter two is on literature review. In this chapter, all the literature pertaining to this work was reviewed.

Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.

Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.

Chapter five is on conclusion, recommendation and references.

 

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the design and construction of a water level control system using ultrasonic sensor, and acknowledges the contributions of scholars who have previously conducted similar research [rev64643] …

Document Information

    • Format: DOC/PDF
    • Title: Design And Construction Of A Water Level Control System Using Ultrasonic Sensor:

YOU MAY LOVE THESE (Recommended)

  • To start a project on evaluation of role of stocktaking and important of stocktaking in administration of stock control, follow these guidelines: It has been well documented in the literature by the production management experts that quality of a reflection of a customer’s perception of what a product should looked like. And for a manufacturing industry to survive in its business quality control should be embraced in all branches of nigeri…

    56 Pages 1 - 5 Chapters 6,966 Words DOC/PDF Format Instant Download UPN62678

  • Techniques for writing the “Water Purification Unit” Project

    To develop a project on water purification unit, follow these approaches: Water purification unit or filtration unit is designed in way that it will give a nice result. Like in our filtration, we have sand and carbon filter that were responded to separate the suspended solid particles, odour and taste of the water, which will give a very nice filtered water at the end …

    60 Pages 1 - 5 Chapters 7,351 Words DOC/PDF Format Instant Download UPN62940

  • To undertake a project on temperature and water requirement for leaching of caustic alkalt from “ngu”, follow these effective ways: The production and analysis of “ngu” extract for temperature and water requirement for leaching of casuistic alkali is the basic objective of this project. The production was carried out by using unit operations and also using the female inflorescence of a palm fruit (eleasis guineesis) as raw ma…

    47 Pages 1 - 7 Chapters 5,369 Words DOC/PDF Format Instant Download UPN62925

  • To write a project on stock control as a management tools for efficient and effective stores operation, follow these structure: Stock control had been a neglected function in an organization due to the fact that most organization both public and private sectors lacks the professionals in the field who are capable of carrying out a good stock system. This work titled ‘’stock control as a management tools for effective and …

    66 Pages 1 - 5 Chapters 7,642 Words DOC/PDF Format Instant Download UPN62894

  • To carry out a project on role of the application of computer in inventory planning and control in an organization, follow these effective methods: Inventories are the life wire of any services and manufacturing organization, they refer to the stock of items used in the operation of the business. This represents a significant portion of most firms assets and such demand proper management of efficiency and effectiveness and in that light it b…

    99 Pages 1 - 4 Chapters 11,775 Words DOC/PDF Format Instant Download UPN62891

  • How to write the “Role Of Stock Control In A Manufacturing Company” Project

    1. 0 introduction stock and its control have a concept which has been as old as human race in the history of mankind. If the origin of stock control is well traced, we discover that it has some elements of recognition. In the story of the early man, we were made to understand that they lived an unsettled life having no control and kept nothing for future use, and due to this, they were faces with different problems caused by out of stoc […]

    66 Pages 1 - 5 Chapters 7,948 Words DOC/PDF Format Instant Download UPN62889

  • To start a project on role of quality control and inspection in consumer satisfaction in a manufacturing firm, follow these guidelines: Quality control as a science has gts root in the origins of mass production, notably in the ford motor company. Inspection quality today is marketing different from anything enuisaged by its american pioneers. Although, most theories of quality control inspection are adopted from management theor…

    89 Pages 1 - 5 Chapters 8,461 Words DOC/PDF Format Instant Download UPN62887

  • To develop a project on role of purchasing in quality determination and control in an organization, follow these approaches: This project work is discussed the role of purchasing in quality determination. Chapter one deals with the introductory part of the project, it also touched the backg0orund of study, statement of problem, objective of study, scope of the study etc. Chapter two discusses the literature review, whi…

    58 Pages 1 - 5 Chapters 5,797 Words DOC/PDF Format Instant Download UPN62877

  • 1. 0 introduction 1. 1 background of the study in every organization no matter how small management will no waste and effort in making arrangement for the supply of wrong quality materials. This is one of the reasons why procurement in most organization more especially in the manufacturing industry are receiving more attention than before, all in a bid to avoid waste arising from wrong for purchasing. In fact purchasing objectives have […]

    41 Pages 1 - 4 Chapters 4,788 Words DOC/PDF Format Instant Download UPN62886

  • To undertake a project on role of marketing research in enhancing customer service level in the power industry, follow these effective ways: Marketing research in now giving position in the solving or organisation problems, both private and public owned organisations. The importance of marketing reach to organisation cannot be over emphasised. Organisation as an open system cannot operate in isolation, they must react to environment (…

    42 Pages 1 - 5 Chapters 4,755 Words DOC/PDF Format Instant Download UPN64279

Live Chat