Natural Flow And Tubing String Design For A Water Drive Reservoir

Abstract

The design of natural flow and artificial lift tubing strings for the whole life of a water drive reservoir was carried out using data based on synthetic reservoir performance based on a material balance. The effects of reservoir properties on the life of the well were also investigated. Constraints such as maximum production, maximum drawdown, limitations on surface facilities capacities, as well as available gas lift were imposed.

The production conditions for natural flow, continuous gas lift, and an ESP for later phases of the reservoir was designed and simulated along time by imposing either a constant flow rate or a constant bottom hole flowing pressure. A forecast of the production of oil and gas as well as the time where tubing strings should be replaced as a function of both the cumulative production and time was presented.

The work was concluded by reservoir pressure was maintained much longer in comparison to other drive mechanism when there is an active water drive preferably edge water drive reservoirs which maintains a steady-flow condition for a long time before water breakthrough into the well.

Finally the following areas were identified for improvement in the development of the work one is that the assumptions in this work is the use of synthetic reservoir performance data based on material balance a possible extension is by incorporating more practical condition by including more wells and the performance with time better analyzed and further oil production economic analysis should be inclusive in the work so that the optimum production pattern of the reservoir could be determined.

 

Chapter One

Introduction

1.1 Overview

Fluids are stored in the reservoir and must be produced to the surface facilities in order to be measured, treated and finally sold or discarded. The flow of fluids from the reservoir towards the final processing facility is divided into three phases: Recovery, Lift and Gathering.

Recovery refers to the flow of fluids from the reservoir into the well bore; Lift refers to the flow of fluids from the bottom of the well bore to the surface wellhead and Gathering refers to the flow of fluids from the wellhead through the gathering network towards the production facility.

Recovery is used in a broader sense a referring to the production including the lift and gathering processes. Lift and gathering process will influence the final recovery of hydrocarbons and must be included in a proper economic analysis.

The flow rate from a well depend on the energy level of the reservoir and the energy losses of the fluids as they flow from the reservoir towards the surface facilities. In order to increase production flow rates we may use processes or systems to either increase the energy level or to facilitate the flow of hydrocarbons. Those systems or processes may be used in the reservoir or

in the production tubing or gathering system. The recovery of hydrocarbons may then be classified as: Primary where no process or method is used to increase energy level or facilitate the flow of hydrocarbons inside the reservoir; Secondary and Tertiary where methods are used to increase energy level and or to facilitate the flow of hydrocarbons in the reservoir.

The lift and gathering may also be classified as: Natural flow – No process or method used to increase energy level or facilitate the flow of hydrocarbons in the production system; Artificial lift– when processes are used to increase the energy level or facilitate the flow of hydrocarbons inside the well bore; Boosting – When processes are used to increase the energy level or facilitate the flow of hydrocarbons downstream of the wellhead.

The recovery of hydrocarbons is classified in the following categories: Primary Recovery (also called Primary Production); Secondary Recovery (also called Secondary Production); Tertiary Recovery (also called Tertiary Production or Enhanced – EOR or Enhanced Production or Improved – IOR or Improved Production). Those categories are usually associated with a method or recovery (or production) used – Primary recovery uses the pressure and displacement of hydrocarbons without any external process using solely the reservoir drive mechanism, secondary recovery supplements the natural drive effects on pressure maintenance and displacement by

water injection or water flood and natural gas injection ; and Tertiary recovery supplements the natural drive by modifying the properties of the fluids by chemical floods, miscible displacement and thermal methods.

Each reservoir is composed of a unique combination of geometric form, geological rock properties, fluid characteristics, and primary drive mechanism. Although no two reservoirs are identical in all aspects, they can be grouped according to the primary recovery mechanism by which they produce. It has been observed that each drive mechanism has certain typical performance characteristics in terms of :Ultimate recovery factor, Pressure decline rate, Gas-oil ratio, Water production. The recovery of oil by any of the natural drive mechanisms is called primary recovery.

The term refers to the production of hydrocarbons from a reservoir without the use of any process (such as fluid injection) to supplement the natural energy of the reservoir

For a proper understanding of reservoir behaviour and predicting future performance, it is necessary to have knowledge of the driving mechanisms that control the behaviour of fluids within reservoirs. The overall performance of oil reservoirs is largely determined by the nature of the energy, i.e., driving mechanism, available for moving the oil to the well- bore. There are basically six driving mechanisms that provide the natural energy necessary for oil recovery:

Rock and liquid expansion drive, Depletion drive, Gas cap drive, Water drive, Gravity drainage drive, Combination drive.

1.2 Methodology

In this work the design of natural flow and artificial lift tubing strings for the whole life of a water drive reservoir will be carried out using data based on synthetic reservoir performance based on a material balance. The effects of reservoir properties on the life of the well will also be investigated.

Constraints such as maximum production, maximum drawdown, limitations on surface facilities capacities, as well as available gas lift and horsepower will be imposed.

Chapter Two: Literature Review

2.0 INTRODUCTION:

This chapter provides the background and context of the research problems, reviews the existing literature on the Natural Flow And Tubing String Design For A Water Drive Reservoir, and acknowledges the contributions of scholars who have previously conducted similar research [REV87608] …

Document Information

    • Format: DOC/PDF
    • Title: Natural Flow And Tubing String Design For A Water Drive Reservoir:

YOU MAY LOVE THESE (Recommended)

  • How to write the “Water Purification Unit” Project

    To start a project on Water Purification Unit, follow these guidelines: Water Purification Unit or filtration unit is designed in way that it will give a nice result. Like in our filtration, we have sand and carbon filter that were responded to separate the suspended solid particles, odour and taste of the water, which will give a very nice filtered water at the end …

    60 Pages 1 - 5 Chapters 7,351 Words DOC/PDF Format Instant Download UPN62940

  • To develop a project on Temperature And Water Requirement For Leaching of Caustic Alkalt From “NGU”, follow these approaches: The production and analysis of “Ngu” extract for temperature and water requirement for leaching of casuistic alkali is the basic objective of this project. The production was carried out by using unit operations and also using the female inflorescence of a palm fruit (Eleasis Guineesis) as raw ma…

    47 Pages 1 - 7 Chapters 5,369 Words DOC/PDF Format Instant Download UPN62925

  • Writing strategies for the “Refurbishment Of Fluid Flow Demonstration Unit” Project

    To undertake a project on Refurbishment Of Fluid Flow Demonstration Unit, follow these effective ways: The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu. The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equip…

    50 Pages 1 - 5 Chapters 7,347 Words DOC/PDF Format Instant Download UPN62934

  • To write a project on Prevalence Of Water Borne Diseases And It’s Implications On The Health Status Of Inhabitants, follow these structure: This study was carried out to examine the prevalence of water borne diseases and it’s implications on the health status of inhabitants of Adogi Community in Nasarawa State. The study was carried out to determine the prevalence of water borne diseases among inhabitants of Adogi Community, assess t…

    64 Pages 1 - 5 Chapters 14,669 Words DOC/PDF Format Instant Download UPN75274

  • To carry out a project on Physiochemical And Heavy Metal Assessment Of Water From Boreholes, follow these effective methods: This study presents the result of quality assessment of water from selected boreholes Kaura Namoda Local Government Area Zamfara State. In this study, three different boreholes were sampled, physically examined and assessed for their physicochemical parameters using standard analytical procedures…

    62 Pages 1 - 5 Chapters 7,720 Words DOC/PDF Format Instant Download UPN66655

  • To start a project on Modification Of Surface, Physical And Chemical Properties Of Activated Carbons For Water Purification, follow these guidelines: The purpose of this work was to study the effect of chemical surface properties of activated carbons for their use in water purification. To achieve this objective, activated carbon in both granular and powdered forms namely: as received and devolatilized carbons were prepared. Proximate analysis…

    75 Pages 1 - 5 Chapters 1,620 Words DOC/PDF Format Instant Download UPN62872

  • Techniques for writing the “Management And Operational Problems Of Rural Water Supply” Project

    To develop a project on Management And Operational Problems Of Rural Water Supply, follow these approaches: This research work is aimed at finding the courses of the organization and management problems of rural water supply programme in Nigeria, with a case study of Anambra State Water Corporation Awka. To guide this study thirteen (13) research questions were formulated and tested with percentages. B…

    67 Pages 1 - 5 Chapters 8,022 Words DOC/PDF Format Instant Download UPN62392

  • INTRODUCTION 1.1 Background to the study The water is the most important natural resource especially in the arid or semi-arid zones that face high population growth, scarcity of freshwater, irregularity of rain- fall, excessive land use change and increasing vulnerability to risks such of drought, desertification and pollution. Thus, the availability and the sustainable use of this resource become the core of the local and national str […]

    45 Pages 1 - 5 Chapters 6,562 Words DOC/PDF Format Instant Download UPN64138

  • To undertake a project on Implementation Of Unified Power Flow Controller (UPFC) For Improvement Of Voltage Stability In A Congested Electric Network, follow these effective ways: As the demand of electricity from an already congested network increases, ensuring voltage stability across the network becomes challenging. One approach in ensuring system stability is to attain system redundancy but their economic and ecological limitations to this. A more cost effective means …

    70 Pages 1 - 5 Chapters 7,914 Words DOC/PDF Format Instant Download UPN85791

  • Steps for writing the “Ground Water Development For Portable Water Supply” Project

    To write a project on Ground Water Development For Portable Water Supply, follow these structure: Groundwater hydrology may be defined as the science of the occurrence distribution, and movement of water below the surface of the earth. Geochydrology has an identical connotation, and hydrogeology differs only by its greater emphasis on geology. Utilization of groundwater dates from ancient tim…

    60 Pages 1 - 5 Chapters 9,053 Words DOC/PDF Format Instant Download UPN62973

Live Chat